Task No. 1.6 — Design Survey <br />For smaller projects, Tetra Tech is proposing to use existing street, water/sewer/storm drain plans, as <br />well as tract maps and water/sewer atlas maps, to prepare the base maps. Locations of driveways, <br />landscape/hardscape, etc. will be added by using aerial photographs of the project area. For larger <br />projects, Tetra Tech will obtain aerial mapping and topography for the project limits. <br />No matter how the base map is produced, Tetra Tech will field verify all existing water valves, water <br />Y" meters, fire hydrants and other appurtenances. In addition, Tetra Tech will "dip" all manholes, catch <br />"' basins and vaults in order to obtain a good understanding of any vertical conflicts for the new design. <br />For water main replacement projects, Tetra Tech typically designs the new main off of curb and not <br />centerline of the street. Street centerline stations are provided for overall control but actual pipeline <br />design is off of curb face. However, for projects with profiles, Tetra Tech will establish horizontal and <br />vertical control based on center -line of the street. <br />Task No. 1.7 — Prepare Base Maps <br />Tetra Tech will perform a job walk after the preparation of the base map to identify conflicts and <br />inconsistencies. <br />Task No. 1.9 — Prepare Preliminary Plans <br />At the preliminary plan stage, Tetra Tech recommends the plans be submitted to the City Fire <br />Department to review locations of the fire hydrants and to move as necessary to establish coverage <br />areas as well as to confirm adequacy of each hydrant location (relative to landscape/hardscape <br />improvements). In addition, at this stage, Tetra Tech feels it is important to discuss the construction <br />sequencing in order to minimize the shut -down period for the homeowners, as well as provide water <br />sources to pressure test the new water main. <br />Tetra Tech has assumed that profiles may be required for new water mains equal to or greater than 12- <br />inches in diameter or in arterial streets. Profiles will be required for all sewer main designs. <br />Traffic control plans will be considered as additional work and only be included as part of an estimate <br />when directed by the City. Traffic control plans will be prepared using "WATCH" manual and City of <br />Santa Ana standard drawings. <br />SAMPLE PROJECT TECHNICAL WORK PLAN <br />Based on the sample project description included within Exhibit "A" of the RFP, we envision the <br />following plan sheets: <br />• Title Sheet <br />• Second Sheet including General Notes, etc. <br />• Rene Drive Plan Sheet (2 plan strips) <br />• San Lorenzo Avenue Plan Sheet (2 plan $trips) <br />CITY OF SANTA ANA <br />TETRA TECH, INC. <br />On -Call Engineeringfor YYater and Sewer Main Improvements <br />