Laserfiche WebLink
<br />Contract Award for Main Street <br />Archway Sign at Broadway Place <br />(Project No. 9209) <br />October 2, 2006 <br />Page 2 <br /> <br />DISCUSSION <br /> <br />On February 21, 2006, The Agency awarded Graphic Solutions a contract to <br />design the archway sign spanning over Main Street north of Broadway Place <br />(Exhibi t 1). The sign is a replica of the old historic sign that once <br />stood across Main Street. The archway sign spans 87 feet across the <br />street and will provide a maximum clearance of 18 feet above the roadway <br />surface. The archway sign will enhance the appearance of the Main <br />Street corridor. The Notice Inviting Bids was advertised on June 30 and <br />July 3, 2006, and bids were opened on September 12, 2006. A summary of <br />the bid invitations mailed, the bids received, and the bid results <br />follows. <br /> <br />Santa Ana Contractors receiving notices: 1 <br />Contractors requesting bidding documents: 6 <br />Bids received: 2 <br />Bids received from Santa Ana Contractors: 0 <br /> <br />NAME OF BIDDER <br /> <br />CITY <br /> <br />BID AMOUNT <br /> <br />1. LNI Custom Manufacturing, Inc. <br /> <br />Hawthorne <br /> <br />$ 220,100.00 <br />$ 274,999.60 <br /> <br />2. Superior Electrical Advertisings <br /> <br />Long Beach <br /> <br />A total of two bids were received and both were responsive. LNI Custom <br />Manufacturing, Inc. advised City staff that Bid Item #4 unit price was <br />incorrect as the product of their unit price multiplied by the quantity <br />is inaccurate. However, the bid amount is correct and the clerical error <br />does not change the total amount of the bid. After reviewing both bid <br />proposals, staff noted that Superior Electrical Advertisings made the <br />same mistake. Staff has found sufficient grounds to accept this clerical <br />error and recommends that LNI Custom Manufacturing, Inc.' s request be <br />granted. The lowest bid was submitted by LNI Custom Manufacturing, Inc. <br />for $220,100, which is below the Engineer's estimate of $369,500. <br /> <br />80A-2 <br />