My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC SYSTEMS ELECTRIC 1C - 2006
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
PACIFIC SYSTEMS ELECTRIC 1C - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:31 PM
Creation date
10/5/2006 5:10:15 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC SYSTEMS ELECTRIC
Contract #
A-2006-245
Agency
Finance & Management Services
Council Approval Date
9/5/2006
Expiration Date
10/30/2007
Insurance Exp Date
2/2/2007
Destruction Year
2012
Notes
A-2004-239
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Jul' 01 06 01.57p <br /> <br />p.7 <br /> <br />(' <br /> <br />Pacific Systems Electric <br />38330 Via La PaJoma <br />Murrieta California 92563 <br />California State License No. 561275 <br />servLcL""0 the petro,eu,1'l<. rvcclU5tr!:1 st",~e ~.9~ <br /> <br />June 21, 2006 <br />CITY OF SANTA ANA <br />Fire Station #1 <br />Santa Ana, california 92702 <br />SeCondary Contaln'ment Testing Status <br />PAGE lWO <br /> <br /> <br /> <br /> () <br /> () <br /> ~ <br /> () <br /> () <br /> () <br />() ~ <br /> ~ <br /> () <br /> ~ <br /> ~ <br /> <br />Demo, concrete, break out, excavate and remove on fuel pump islands and area in <br />front of island as required for UDC installation <br />Remove clean backfill material as reqUired to reveal piping under dispensers <br />Remove existing defective UOC's (mechanical leak detection devices built in to UOC <br />base) <br />Collect up to (4) soil samples. Analyze per Santa Ana Fire Dept Fire Dept. <br />requirements <br />Remove existing double walled fiberglass piping from two dispensers <br />Provide and install 2" primary and 3" secondary fiberglass piping materials from <br />existing fiberglass piping; bring new fiberglass piping int:o new UDC's a make <br />connections . <br />Provide and in$tall (2) new under dispenser containment sump boxes <br />Provide new electrical penetration fittings, piping penetration fittings to new UDC's <br />and make connections to existing electrical and piping. . <br />Install new uot brackets for mounting of product piping and shear valves <br />Provide electrical materials as required to make all connections to exiSting conduiCi. <br />Provide and install Beaudreau Electronic stand alone controllers and non- <br />discriminating sensors one at each UDC to provide for positive shut down upon an <br />alarm event. <br />~ complete primary piping pressure test and. inspection for' Santa Ana Fire Dept. <br />() Compll;'!te secondary piping pressure test.and inspection for Santa Ana Fire Dept. <br />() Complete hydrostatic test and inspection for santa Ana F1re Dept at each under <br />dispenser containment sump <br />~ Replace excavated clean till dirt as required <br />~ Provide, place and finish concrete in construction disturbed areas <br /><> Replace owners (2) dispensers <br />() Perform precision line tests to confirm new piping integrity <br />() Conduct fiberglass repair to diesel fill and turbine sump at sump riser to tank collar <br />junction <br />() Complete final inspection with Santa Ana Fire Dept. <br /> <br />Cost to supply scope of work as outlined above $29,859.00 <br /> <br />951.677.0704 Fax 951.698.5436 888.293.5944 <br />
The URL can be used to link to this page
Your browser does not support the video tag.