My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC SYSTEMS ELECTRIC 1C - 2006
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
PACIFIC SYSTEMS ELECTRIC 1C - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:31 PM
Creation date
10/5/2006 5:10:15 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC SYSTEMS ELECTRIC
Contract #
A-2006-245
Agency
Finance & Management Services
Council Approval Date
9/5/2006
Expiration Date
10/30/2007
Insurance Exp Date
2/2/2007
Destruction Year
2012
Notes
A-2004-239
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />C) <br /> <br />c, <br /> <br />Jul. 01 06 01: 56p <br /> <br />p.3 <br /> <br />Pacific Systems Electric <br /> <br />38330 Via La Paloma <br />Murrieta California 92563 <br />Califomia State License No. 561275 <br />servtc'''''0 tile 1"tt'oleuw. I",-c\u!'t'i:l si""ce ~5l?9 <br /> <br />June 23, 2006 <br />CITY OF SANTA ANA <br />CllY POUCE & JAIL <br />Santa Ana, California 92702 <br />secondary Containment Testing Status <br />PAGE TWO <br /> <br /><> Arrange for inspections with Santa Ana Fire Deptto witness testing. <br />~ Backfill excavation with clean material that was previously removed. <br /><>Provide, place and finish concrete in construction disturbed areas <br /> <br />Cost to provide scope of work as outlined above $12,809.00 <br /> <br />Assumptions <br />The following items may affect the project cost: <br />. Actual cost of permits, if any, is not included <br />. Note: Plans, dr;;wings and permitting cost are included in the scope of work below <br />. Soil samples should not be required and are not included <br />. No removal or stockpiling of contaminated soil <br />. Removal and replacement of private utilities that are flot marked on the surface <br />within 10 feet of the proposed excavation area. <br />. Concrete thickness greater than 8" or asphalt thickness greater than 4" <br />. Geotechnical work / Groundwater I Shoring or Bonding / Trench plates <br />. Primary supply line wiil be disconnected briefly, no provision included for alternate <br />generator <br />. The supply/return piping secondary piping could not be tested until these repairs are <br />complete. Other piping repairs maybe required at areas unknown. <br />. Care will be exercised when breaking concrete around existing manhole, but cannot <br />warrant existing manhole. <br />. Any plan check changes not included <br />. Job can be completed as outlined <br /> <br />CITY POUCE UNLEADED FUEL SYSTEM <br />The Fuel Island Under Dispenser Containment (UDC) boxe~, are manufactured by <br />Environ that are very small and shallow UDC's with bottom ~lOtry fittings. In prior years <br />a repair made by others on UDC number 1/2 is identified as the source of leakage at the <br />secondary fitting on the primary product piping. This same (Irea of leakage is identified <br />on UDC number 3/4. All of these entry fittings, piping and electrical, terminating through <br />the bottom of the UDC have bolted flanges inside and outsicle (underground) the UDC. ' <br />An underground repair is needed due to this old style config:Jration. <br /> <br />951.677.0704 Fax 951.698.5436 888.293,5944 <br />
The URL can be used to link to this page
Your browser does not support the video tag.