My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />TABLE OF CONTENTS <br />Task1 : <br />Project Kickoff.........................................................................................................................4 <br />Task 1-A: <br />Finalize Hardware Requirements and Conduct Site Survey/Preparation...............................6 <br />Task 1-B: <br />Develop Final Project Schedule..............................................................................................7 <br />Task 1-C: <br />Conduct CAD Preconfiguration...............................................................................................7 <br />Task 1-D: <br />GeoFile (MAP) Build Workshop..............................................................................................8 <br />Task 1-E: <br />Requirements Validation process for CAD, Mobile, and Interfaces........................................9 <br />Task 2 : <br />TriTech Base Software Installation.......................................................................................10 <br />Task 3 : <br />Geofile Installation/Training (Map Maintenance)..................................................................11 <br />Task4 : <br />CAD Configuration................................................................................................................12 <br />Task 5 <br />CAD Subsystem Interfaces...................................................................................................13 <br />Task6 : <br />Mobile Implementation..........................................................................................................13 <br />Task 7 : <br />Software Receipt and Installation..........................................................................................14 <br />Task 8 : <br />TriTech Mobile Tailoring and Configuration..........................................................................15 <br />Task 9 : <br />TriTech Mobile Technical/User Training...............................................................................16 <br />Task 10 : <br />TriTech Mobile Functional Testing........................................................................................17 <br />Task 11 : <br />Deliver TriTech Mobile As -Built Specification Documents....................................................18 <br />Task 12 : <br />Deliver CAD Documentation................................................................................................18 <br />Task 13 : <br />CAD Functional Testing........................................................................................................19 <br />Task 14 : <br />CAD Subsystem Integration Testing.....................................................................................20 <br />Task 15 : <br />CAD Technical/User Training and Related Training Documentation....................................21 <br />Task 16 : <br />CAD Production Cutover.......................................................................................................22 <br />Task 17 : <br />CAD Subsystem Reliability Testing.......................................................................................22 <br />Task18 : <br />CAD Refresher Training........................................................................................................23 <br />Task 19 : <br />Total System Integration Validation......................................................................................24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.