Laserfiche WebLink
Exhibit A: Statement of Work <br />a. Verify each function identified in the ATP to its operation as documented. <br />b. Document each discrepancy of functionality per the ATP.. <br />C. Work with TriTech to identify the type of correction needed to ensure that each subsystem <br />conforms to the ATP. <br />Completion Criteria: <br />This task is considered complete when TriTech's mobile system has been demonstrated to operate in <br />accordance with the TriTech specification documents, Santa Ana's configuration requirements and the <br />TriTech Acceptance Test Plan on six (6) Santa Ana -supplied MDCs (the installation of the mobile software <br />on the remaining Santa Ana -supplied MDCs is not required for task completion). <br />Task 11: Deliver TriTech Mobile As -Built Specification Documents <br />Objective: Document and deliver the TriTech As -Built Specification Documents supplemented by <br />documentation that will support the user's utilization of the subsystem. <br />Task Description: <br />TriTech will modify the baseline specification and interface control documents to reflect the specific <br />changes required for implementation. TriTech will supplement the documentation above to support the <br />user's utilization of the application. At a minimum, the supplemental documentation will include a schema, <br />data dictionary and error code dictionary. Other features will be mutually agreed to between the City and <br />TriTech. <br />Responsibilities: <br />TriTech shall: <br />a. Prepare final TriTech mobile As -Built Specification documents. <br />b. Prepare final interface control documents for each interface installed. <br />C. Incorporate mutually agreed -to revisions into the supplemented documentation described above <br />and deliver a set of final documents to Santa Ana. <br />Santa Ana shall: <br />a. Review the TriTech As -Built specification documents submitted by TriTech and identify in writing <br />any specific deficiencies found within twenty (20) business days of receipt. <br />b. Review the final interface control documents submitted by TriTech and identify in writing any <br />specific deficiencies found within twenty (20) business days of receipt. <br />Completion Criteria: <br />This task is considered complete upon submittal of the finalized as -built documentation and City accepted <br />TriTech as -built specification and interface control documents. <br />Task 12: Deliver CAD Documentation <br />Objective: Document and deliver the CAD Documentation described in TriTech's Proposal to Santa <br />Ana, to include training guides, reference guides, configuration guides, system <br />administration manuals and related standard documentation supplemented by <br />18 <br />