My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />Santa Ana shall: <br />a. Document each discrepancy between the CAD subsystem functionality and the ATP material. <br />b. Work with TriTech to identify the type of correction needed to ensure that the subsystem conforms <br />to the testing criteria. <br />Completion Criteria: <br />This task is considered complete when CAD has been demonstrated to operate in accordance with the <br />TriTech RFP response and the system acceptance test plan criteria, thus passing the functional tests. <br />Task 14: CAD Subsystem Integration Testing <br />Objective: Perform integration testing of the CAD subsystem, Mobile and other interfaces. <br />Task Description: <br />Demonstrate all internal and external interfaces to ensure that the combined CAD subsystem, and Mobile <br />application operate as defined in the as -built CAD and Mobile documentation, the ATP and the interface <br />control documents. <br />Responsibilities: <br />TriTech shall: <br />a. Certify the interfaces as ready for integration testing. <br />b. Demonstrate all inter -system communications between installed TriTech systems and between <br />TriTech and non-TriTech systems, according to the as -built CAD and Mobile documentation, the <br />ATP and the interface control documents. <br />C. Assist Santa Ana in testing each interface. <br />d. Review and correct any discrepancies that are identified by Santa Ana prior to final system <br />acceptance and payment. <br />Santa Ana shall: <br />a. Conduct test procedures and verify all inter -system communications between installed TriTech <br />systems and between TriTech and non-TriTech systems to ensure conformance with the as -built <br />CAD and Mobile documentation, the ATP and the interface control documents. <br />b. Identify in writing each discrepancy between subsystem and ancillary system functionality and the <br />as -built CAD and Mobile documentation, the ATP and the interface control documents within ten <br />(10) business days. <br />C. Work with TriTech to identify the type of correction needed to ensure that each subsystem and <br />ancillary system conforms to the as -built CAD and Mobile documentation, the ATP and the <br />interface control documents. <br />Completion Criteria: <br />This task is considered complete when the internal and external interfaces (defined in Exhibit B and any <br />change orders) and other TriTech licensed software has been verifiably operational according to the as - <br />built CAD and Mobile documentation, the ATP and the interface control documents. Any discrepancies <br />discovered following the completion of this task shall be corrected prior to final acceptance and <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.