My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA 1-2006
Clerk
>
Contracts / Agreements
>
W
>
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA 1-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:52:51 PM
Creation date
10/9/2006 12:45:31 PM
Metadata
Fields
Template:
Contracts
Company Name
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA
Contract #
A-2006-266
Agency
PLANNING & BUILDING
Council Approval Date
4/3/2006
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., ~ .' . . <br /> <br />( <br /> <br />DPNo.2006-l4R <br /> <br />-3- <br /> <br />( <br /> <br />August 2, 2006 <br /> <br />f. Operation and Maintenance (O&M) Plan to describe the long-term operation and <br />maintenance requirements of all applicable Structural BMPs and to identif'y the entity <br />in charge of implementation. <br /> <br />NOTE: All new developments and existing facilities with significant redevelopment, <br />irrespective of their size or category (priority or Non-priority) shall provide and <br />have approved a Water Quality Management Plan (WQMP) prior to the <br />issuance of a grading permit. The WQMP document shall describe all <br />applicable BMPs consistent with the approved surface drainage/grading plan. <br />Contact Joe Parco at (714) 647-5630 for assistance. <br /> <br />4. Submit for review and approval a surface drainage/grading/ erosion control plan, prepared <br />by a registered Civil Engineer, showing the direction and means of flow to the adjacent <br />street. The plan is to include existing and proposed elevations at and adjacent to all <br />property lines. Drainage routed to the street must be directed beneath the sidewalk and <br />through the curb. <br /> <br />5. Pay the required fees as follows: <br /> <br />a. WQMP Checking Fee. <br /> <br />b. Plan Check Fee - surface drainage/grading/erosion control. <br /> <br />c. Federal Clean Water Protection Enterprise Fee - a surcharge of26% added to Public <br />hnprovement Plan Check, Sewer Lateral/Water Service, Street Work Permit, and <br />Grading Permit fees. <br /> <br />NOTE: The above fees are current and subject to change. The applicant must pay the <br />prevailing rate at the time payment is made. <br /> <br />C. Prior to the issuance of a buildine: permit.. complete the followine:: <br /> <br />1. File, process, and record the following: <br /> <br />a. 25 'X25' comer cut-off irrevocable offer to dedicate at the northwest comer of Bristol <br />Street/Pine Street and the southwest of Bristol Street/Walnut Avenue. <br /> <br />b. File, process, and record a Lot Merger/Final Map, as required by the Planning and <br />building agency. <br /> <br />NOTE: Please contact Ian Leveton at (714) 647-5019 for assistance. <br /> <br />2. Prepare and submit for approval a street improvement plan for all work required to be <br />constructed within the public right-of-way per the traffic study and the run-off study <br />recommendations. Contact Rolando Mateo at (714) 647-5021 for assistance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.