Laserfiche WebLink
<br />'J -f' ... ~ <br />DP No. 2006-14R <br /> <br />( <br /> <br />-5- <br /> <br />( <br /> <br />August 2, 2006 <br /> <br />5. Street work is required to be performed by a licensed contractor. The contractor must <br />provide the following prior to the issuance of the street work permit: <br /> <br />a. A City of Santa Ana business license. <br /> <br />b. A Certificate of Insurance of general liability containing requirements as set forth by <br />the City Attorney. <br /> <br />c. A Contractor's license (with approved classification). <br /> <br />d. Proof of Workers' Compensation Insurance. <br /> <br />e. Two (2) sets of the approved street improvement plans. <br /> <br />f. If there are any new connections to the City's Water Main, provide an approved <br />application for installation of Water Service. For an application, contact Phillip <br />Vakili at (714) 647-3322. <br /> <br />6. Should the developer seek a building permit release prior to completing the off-site <br />improvements, the developer must provide a cash bond (or cash deposit) in an amount <br />specified by the City of Santa Ana upon approval of all improvement plans and unit <br />quantities. This cash bond (or cash deposit) shall guarantee the construction of all <br />necessary improvements. The cash deposit shall be released within 45-days from the date <br />that the improvements have been completed and the street work permit has been signed <br />off by the Public Works Agency's Construction Inspector. The deposit amount will be <br />determined based upon surface drainage and street improvement plans. <br /> <br />D. Prior to the issuance of auulications for water and fire services. comulete the followinl!: <br /> <br />1. Arrange for installation of any needed new, or relocation or upgrading of any existing <br />domestic or irrigation water services as required by the Public Works Agency. These <br />facilities will be installed in conformance with City Standards and approved plans. <br />Installation will be done by the developer's contractor (requiring an "A" or a "C-34" <br />contracting license) following the issuance of a water application and a street work <br />permit. Demand calculations per gallon per minute for size determination are required <br />for both domestic and irrigation water meters. Contact Phillip Vakili at 647-3322 for <br />assistance. <br /> <br />NOTE: All projects with more than 2,500 square feet of landscaping and a lot size <br />greater than 15,000-square-feet will require a separate landscape irrigation water <br />meter of proper size to supply the project's landscape irrigation system. <br /> <br />2. Arrange for installation of any new or relocation or upgrading of any existing fire <br />protection facilities as required by the City of Santa Ana Fire Department. These <br />facilities will be installed in conformance with the City Standards and approved plans. <br />Installation will be done by the developer's contractor (requiring an "A" or a "C-34" <br /> <br />l <br />