My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA 1-2006
Clerk
>
Contracts / Agreements
>
W
>
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA 1-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:52:51 PM
Creation date
10/9/2006 12:45:31 PM
Metadata
Fields
Template:
Contracts
Company Name
WONG, SHIEN NAN & WENG, HUI JUNG & TAQUERIA TAPATIA
Contract #
A-2006-266
Agency
PLANNING & BUILDING
Council Approval Date
4/3/2006
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.( "f' ....... _ <br />DP No. 2006-l4R <br /> <br />( <br /> <br />-6- <br /> <br />( <br /> <br />August 2, 2006 <br /> <br />contracting license) following the issuance of a water application and a street work <br />permit. Contact Fire Department Plan Check at (714) 647-5700 for assistance. <br /> <br />3. Prior to turning on water meters (domestic and irrigation) and/or fire services, arrange for <br />installation, testing and certification of all needed backflow protection devices, whether <br />such devices are shown on the project plans or not. Approved backflow devices will be <br />installed on-site by the developer in conformance with the code regulations and the City <br />requirements. Contact Tom Dix at (714) 647-3341 for assistance. <br /> <br />E. Prior to connection to the City or OCSD sanitary sewer systems: <br /> <br />1. All new development projects fronting a City public sewer or Orange County Sanitation <br />District (OCSD) sewer shall be served by a separate and new sewer lateral connection(s) <br />to serve each individual lot or parcel. <br /> <br />2. The Developer shall arrange for construction of the new sewer lateral(s) per the City <br />Standards and approved Improvement plans, following the issuance of a Street Work <br />Permit. The sewer lateral shall be installed by a licensed contractor that possesses either <br />an "A", "C-34", or "C-36" license. <br /> <br />3. Use of a common or shared sewer lateral/system among separate commercial/industrial <br />parcels or residential lots (with no direct public sewer access) is only allowed if a CC&R's <br />for maintenance and cost sharing responsibility of such laterals/systems is prepared and <br />recorded. <br /> <br />4. Construction of a new or using an existing OCSD sewer lateral connection shall be <br />approved by OCSD officials in advance. The developer shall submit plans to OCSD for <br />review and approval. After the connection plan is approved by OCSD, the City of Santa <br />Ana will process an OCSD connection permit. The connection permit will be issued to the <br />developer by OCSD upon payment of applicable OCSD permit inspection fees. <br /> <br />5. Any existing sewer lateral(s) serving the project site shall be properly capped and <br />abandoned at the property line. Contact Phillip Vakili at (714) 647-3322 for assistance. <br /> <br />Please contact Nasser Rizk, Senior Engineer, at (714) 647-5036 for assistance regarding the <br />above requirements. <br /> <br />Attachment <br /> <br />T:\Development Services\Development Project Files\BristoIS202 _06-014R_ WongRetail Buildings_NR\MEMO _BristoIS202_06-Q14R_ WongRetail Buildings_NRdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.