Laserfiche WebLink
<br />DAKTRONICS E N GIN E ERE D fOR THE fAN 5 <br /> <br /> <br />SECTION D <br />INSTALlAnON RESPONSlBlunES - FOOTBALL <br /> <br />Responsible Por1y: <br />Daktronics Purchaser Description <br />x 1. Removel ond disoosol of existina football scoreboard. <br />x 2. Removel and disoosal of existing football scoreboard structure texduding Ioafinos.! <br /> x 3. Soil comoacfion test. <br />x 4. Secure construction oermits. <br />x 5. Enaineerina desian of the football scoreboard sunnnrt structure excluding footinos. <br />x 6. Engineering certification stamo for support structure desian. <br />x 7. Riser diaaroms of electrical ond sianol. <br />x 8. Shoo drowina and attachment detail submittals. <br /> x 9. Provide camero-ready artwork for ad ponels and looos. <br /> x 10. Approval of 011 engineering drawings, riser diagrams, shop drawings, locations, and ad copy <br /> lavouts. <br /> x 11. Locate underaround utilities. <br /> x 12. Unobstructed access to Santa Ana Stadium. <br /> Digging of footings including dirt removal. Fabrication and installation of steel cages, re- <br /> bar, or bolt attachments. Pouring and finishing of concrete for footings. (Note: In the event <br />x 13. we hit rock, water, or anything unexpected while digging the footings, if we do work, the <br /> Customer will be responsible for any additional cosls, plus Overhead and Profit of 20%). <br />x 14. Steel fabrication and comolete structure installafion of suooort structure. <br />x 15. Prime and paint main structure. <br />x 16. Crating and shipping all equipment to Santa Ana Stadium via common or independent <br /> carrier. <br />x 17. Unloading of all eauioment from carrier. <br />x 18. Lift and mount Football Scoreboard ad ponels and Galaxy displavs. <br />x 19. Unoack set UD, hook uD,and testina of control svsIem. <br /> x 20. Air-conditioned control room for all control SYStems (on venue site or oft). <br />x 21. Primary power and tronsformer and fused lockable electrical distribution ponel for <br /> football/video disDlavs. <br /> Secondary power conduits, power cable, power hook-up from the fused electrical panel <br />x 22. located in the main football displays to all Daktronics supplied load centers in each <br /> football/video disDlavs includina air conditionina electrical hook-uD lor video disolav. <br /> x 23. Required power outlets for all control systems. <br />x 24. Furnish 01/ sianal cable for Santa Ana Stadium Football Scoreboard. <br />x 25. Provide and install sianol coble conduit, as delineated in riser diagrams. <br />x 26. Labor to Dull all new sianal cable land remove existina cable if reauired!. <br />x 27. Terminate signal cable. <br />x x 28. Site clean uo after Daktronks work. <br />x x 29. Provide personnel for maintenance and operator trainina. <br /> x 30. Final acceDtance, Der DF1252. <br />x x 31. Landscaping <br />NOTE: All Change Order wor\;. performed by Daktronics or Daktronics Subcontractor, will be performed at Cost Plus 20% <br /> Overhead and Profit. <br /> <br />Quote 227971 Rev 03 Dote 29Aug06 Page 7 of 7 <br />Copyright ~ Daktronics, Inc. DF-02330 Rev 06 21 Jun06 <br /> <br />D <br /> <br />DAKTRONICS <br /> <br />