Laserfiche WebLink
<br />DAKTRONICS E N GIN E ERE 0 FOR THE fAN 5 <br /> <br /> <br />:~~:i~'~\~ <br /><:~;,titl~I9c;:-:!~ <br /> <br />SECTION D <br />INSTAUAnON RESPONSIBILInES - MARQUEE <br /> <br />Responsible Portv: <br />Oaktronics Purchaser Descrintion <br />x 1. Removal and disoosol of existino message center. <br />x 2. Removal and disoosal of existina messaae center structure (excludina footinas). <br /> x 3. Soil compaction test. <br />x 4. Secure construction permits. <br />x 5. Enaineerina desion of the rnessooe center suooort structure lexcludino footinasL <br />x 6. Enoineerino certmcalion stomo for suooort structure desian. <br />x 7. Riser diaarams of electrical and siana!. <br />x 8. Shon drawinn and aftachment detail submittals. <br /> x 9. Provide camera-readv ar1work for all ad oanels and looos. <br /> x 10. Approval of all engineering drawings, riser diagmms, shop drawings equipment locations, <br /> and ad coov lavouts. <br /> x 11. Locate underoround utilities. <br /> x 12. Mark location of marauee. <br /> x 13. Unobstructed access to Santa Ana Stadium. <br /> Digging of footings including dirt removal. Fabrication and installation of steel cages, re- <br /> 14. bar, or bolt attachments. Pouring and finishing of concrete for footings. (Note: In the event <br />x we hit rock, water, or anything unexpected while digging the footings, if we do work, the <br /> Customer will be resoonsible for any additional casts, olus Overhead and Profit of 20%). <br />x 15. Steellabrication and complete structure installation of suooort structure. <br />x 16. Prime and oaint main support structure. <br />x 17. Crating and shipping of all equipment to Santa Ana Stadium via common or independent <br /> carrier <br />x 18. Unloadino of all eauioment from carrier. <br />x 19. lift and mount messoae center, structure and shroudina. <br />x 20. Unnnck, set-uP. hook-uo, and testino of control """"'m. <br /> x 21. Air-conditioned control room for all control sYStem (on venue site or oft). <br /> Primary power and -transformers for new message center-display and fused lockable . <br />x 22. electrical oonellto be located 5' off the around on one of the sunnortina beams). <br />x 23. Secondary power conduits, power cable and power hook-up from the fused electrical panel <br /> to all Daktronics supplied load centers or internal nower termination panels <br />x 24. Furnish all sianal cable for Marauee. <br />x 25. Provide and install siano I cable conduit, as delineated in riser diaarams. <br />x 26. Labor to pull all new sianal cable (and remove existino cable, if reouired)' <br />x 27. T enninate sianal cable. <br />x 28. Structure, ladder wav and catwalks to meet OSHA or ANSI renuirements. <br />x 29. Mountina of temo sensor. <br /> x 30. T eleohone line to bose of sian. <br /> x 31. T eleohone line monthly fee. <br />x x 32. Provide oersonnel for maintenance and ooerator trainina. <br />x x 33. Site clean UP after Daldronics work. <br /> x 34. Final accentance, oer DF1252. <br />x x 35. Landscaoino, <br />NOTE: All Change Order work, performed by Daktronics or Daktronics Subcontractor, will be performed at Cost Plus <br /> 20% Overhead and Profit. <br /> <br />Quote 227971 Rev 03 Dote 29Aug06 Page 8 of 8 <br />Copyright@ Daktronics, Inc. DF-02330 Rev 06 2lJun06 <br /> <br />D <br /> <br />DAKTRONICS <br /> <br />