Laserfiche WebLink
once annually and include it in the report. Time Warner has provided this <br />years test documentation that shows weekly and monthly testing currently <br />being performed on the EAS system. This has satisfied CSG's <br />requirements for EAS testing. <br />7. RECOMMENDATIONS <br />It is the recommendation of Communications Support Group that Time <br />Warner Cablevision of Santa Ana is considered in compliance with the <br />technical standards of the Federal Communications Commission. <br />The following summarizes the areas in need of clarification: <br />1) Form and Content of the Summer FCC Proof Report: <br />The City should review the final document and insure it is correct <br />form. <br />2) Other residential system performance matters to be <br />addressed. <br />A. Other FCC rules require Time Warner to file periodic <br />performance results related to Cumulative Leakage (RF <br />radiation). CSG recommends that Time Warner be required <br />to file a copy of its most recent CLI report filed with the City. <br />Time Warner is using new GPS technology called the Sniffer <br />Slueth for CLI monitoring. Attached is an annual summary of <br />the CLI leakages found and repaired. <br />3) Calibration of test equipment <br />Time Warner has adhered to the rules and regulations of the FCC <br />proof of performance testing in regards to test equipment <br />calibration. The calibration dates of test equipment used are <br />included in the report. <br />4) Time Warner Main Office Location <br />Time Warner has moved their main office and local origination <br />programming from the city of Santa Ana. The office and playback is <br />now located at their new Anaheim Facility. Time Warner's main <br />office is located at 3041 E. Mira Loma Ave, Anaheim CA 92806. All <br />Time Warner administration and customer service originates from <br />this facility. <br />Communications Support Group, VP RPT2007.001 Pagel 0 <br />