Laserfiche WebLink
<br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetabies, the project wliI <br />still be deemed to be the same construction pro~ <br />ject <br /> <br />E. The provisions of Limits Of Insurance (SECTION <br />III) not otherwise modified by this endorsement <br />shail continue to apply as stipulated. <br /> <br />Page 2 of 2 <br /> <br />Copyright, Insurance Services Office, Inc., 1996 <br /> <br />CG 25 03 03 97 <br /> <br />c <br />