Laserfiche WebLink
Tierra de las Pampas <br />September 1, 2006 <br />Page 10 <br />TASK 4 - Construction Support (maximum 20 hours) <br />A. Attend pre - construction meeting. <br />B. Perform site visits to observe completion of project milestones. <br />C. Prepare site visit reports <br />D. Attend final walk - through, assist in preparing punch list. <br />E. Attend final inspection. <br />Items not Included: <br />The following services are not included in our proposal or scope of services but can be provided <br />for an additional fee if required: <br />Additional meetings not listed <br />Design and development of interpretive programs and graphics. <br />Construction staking <br />Design revisions caused by changes in the previously approved concept design or site plans <br />Environmental assessment <br />Mechanical or plumbing systems other than noted under Task 3, <br />Mechanical engineering services <br />Electrical systems other than noted under Task 3. <br />Electrical Engineering <br />Water quality management plan <br />Responsibilities of City <br />The City would be responsible for the following: <br />As -built information from City files <br />Supplying of title reports on the park parcels. <br />Soils reports and testing <br />City formatted sheets, electronic format <br />Inspection during construction <br />Prepare bid forms and specification boilerplate <br />Printing and reproduction <br />Insurance <br />We will supply insurance certificates verifying our compliance with the Insurance Requirements <br />outlined in the Request for Proposal. <br />