My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1 - 2006
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:24:13 PM
Creation date
12/19/2006 12:46:11 PM
Metadata
Fields
Template:
Contracts
Company Name
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA
Contract #
A-2006-270
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/2/2006
Insurance Exp Date
10/1/2010
Destruction Year
2014
Notes
Worker's Comp exp 10/1/09 Amended by A-2008-050
Document Relationships
ANN CHRISTOPH LANDSCAPE ARCHITECT ASLA 1A - 2008
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\A (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tierra de las Pampas <br />September 1, 2006 <br />Page 10 <br />TASK 4 - Construction Support (maximum 20 hours) <br />A. Attend pre - construction meeting. <br />B. Perform site visits to observe completion of project milestones. <br />C. Prepare site visit reports <br />D. Attend final walk - through, assist in preparing punch list. <br />E. Attend final inspection. <br />Items not Included: <br />The following services are not included in our proposal or scope of services but can be provided <br />for an additional fee if required: <br />Additional meetings not listed <br />Design and development of interpretive programs and graphics. <br />Construction staking <br />Design revisions caused by changes in the previously approved concept design or site plans <br />Environmental assessment <br />Mechanical or plumbing systems other than noted under Task 3, <br />Mechanical engineering services <br />Electrical systems other than noted under Task 3. <br />Electrical Engineering <br />Water quality management plan <br />Responsibilities of City <br />The City would be responsible for the following: <br />As -built information from City files <br />Supplying of title reports on the park parcels. <br />Soils reports and testing <br />City formatted sheets, electronic format <br />Inspection during construction <br />Prepare bid forms and specification boilerplate <br />Printing and reproduction <br />Insurance <br />We will supply insurance certificates verifying our compliance with the Insurance Requirements <br />outlined in the Request for Proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.