Laserfiche WebLink
SECTION 01300 — CONTRACTOR SUBMITTALS <br />PART 1 — GENERAL <br />1.1 GENERAL <br />A. Wherever submittals are required hereunder, all such submittals by the <br />CONTRACTOR shall be submitted to the ENGINEER. <br />1.2 PRECONSTRUCTION CONFERENCE SUBMITTALS <br />A. At the preconstruction conference referred to in Section 01010, "Summary of Work," <br />the CONTRACTOR shall submit the following items to the ENGINEER for review: <br />A preliminary schedule of Shop Drawings, Samples, and proposed Substitute <br />( "Or- Equal ") submittals listed in the Bid. <br />2. A list of all permits and licenses the CONTRACTOR shall obtain indicating the <br />agency required to grant the permit, the expected date of submittal for the <br />permit, and required date for receipt of the permit. <br />1.3 SHOP DRAWINGS <br />A. Wherever called for in the Contract Documents, or where required by the <br />ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, three (3) <br />copies of each shop drawing submittal. The term "Shop Drawings" as used herein <br />shall be understood to include detail design calculations, shop drawings, fabrication, <br />and installation drawings, erection drawings, list, graphs, catalog sheets, data sheets, <br />and similar items. Whenever the CONTRACTOR is required to submit design <br />calculations as part of a submittal, such calculations shall bear the signature and seal <br />of an engineer registered in the appropriate branch and in the state wherein the <br />project is to be built, unless otherwise directed. <br />B. All Shop Drawing submittals shall be accompanied by the CONTRACTOR's standard <br />submittal transmittal form. <br />C. Normally, a separate transmittal form shall be used for each specific item or class of <br />material or equipment for which a submittal is required. Transmittal of a submittal of <br />various items using a single transmittal form will be permitted only when the items <br />taken together constitute a manufacturer's "package" or are so functionally related <br />that expediency indicates review of the group or package as a whole. A multiple -page <br />submittal shall be collated into sets, and each set shall be stapled or bound, as <br />appropriate, prior to transmittal to the ENGINEER. <br />D. Except as may otherwise be indicated herein, the ENGINEER will return review <br />comments on each submittal to the CONTRACTOR with its comments noted thereon, <br />within 30 calendar days following their receipt by the ENGINEER. It is considered <br />reasonable that the CONTRACTOR shall make a complete and acceptable submittal <br />to the ENGINEER by the second submission of a submittal item. The CITY reserves <br />the right to withhold monies due to the CONTRACTOR to cover additional costs of <br />City Santa Ana <br />Security Submittals ty Management System Project Page 01300 -1 <br />SantaAna_SMS_01300 <br />