Laserfiche WebLink
SECTION 17010 —SECURITY MANAGEMENT SYSTEM GENERAL REQUIREMENTS <br />PART 1 — GENERAL <br />1.1 GENERAL <br />A. General: The CONTRACTOR shall develop, furnish, install and place into service a <br />Security Management System (SMS) including, cameras, motion detectors, mounting <br />poles, mounting hardware, security equipment panels, Ethernet switches, DC power <br />supplies, UPSs, SMS server computer, SMS color printer, relay server software, view <br />station software, alarm notification software, viewing devices and communications <br />network and appurtenances, as required, to perform the specified monitoring, control, <br />alarming, logging and communications for the CITY facilities all in accordance with <br />the requirements of the Contract Documents. <br />The work, equipment and services covered by this Specification shall include, but not <br />necessarily be limited to, supply of all necessary equipment, components, material, <br />transportation, labor, special tools, installation, and services for engineering, <br />manufacturing, programming, testing at factory and job site, documentation, <br />supervision of installation, startup operation, maintenance, and training for the CITY <br />- --- ---persaiet- forirrstrumentatto— and - control-to b"-stahed art- the- CIT-Y-iadlt lies. - -It sh—afl <br />be the responsibility of the CONTRACTOR to coordinate the Work and equipment, as <br />set forth in this Section of the Specifications, with Work and equipment specified <br />under other sections of the Specifications, in order to provide a complete and <br />satisfactory installation. The ENGINEER and the CITY must approve all deviations <br />from the Drawings or Specifications, in writing. <br />The CONTRACTOR shall coordinate with the phone company to secure three T1 <br />broadband phone lines at each of the four project sites in the City and supply all <br />necessary equipment to accomplish the communications paths. <br />B. SMS Upgrade: It is the intent of these specifications that the CITY personnel or <br />designated individuals shall be able to incorporate future sites into the system with no <br />need for any custom programming. This feature shall be demonstrated during the <br />Factory Acceptance Test and covered in the Operator Training, as well as Contract <br />Submittals and Operations & Maintenance portions of the Contract. <br />C. SMS Supplier: The SMS Supplier shall be a single firm, or corporation designated to <br />assume full responsibility for the Project to perform all engineering to select, furnish, <br />supervise the installation, program, test, calibrate, and place into operation all <br />cameras, instrumentation, controls, communications, and Security Equipment Panels, <br />including application software, for a complete, integrated and functional system. The <br />SMS Supplier at no additional cost to the CITY shall make any updates to the <br />system software that may be required during the warranty period. Thereafter <br />such service shall be performed if a maintenance contract between the CITY and the <br />CONTRACTOR is in effect, or provided at the request of the CITY at a reasonable <br />hourly rate. <br />The CONTRACTOR shall coordinate the WORK of the SMS Supplier for the <br />installation, interconnection, testing, calibration, and operation of the cameras, <br />City of Santa Ana Security Management System General Requirements <br />Security Management System Project Page 17010 -1 <br />SantaAna_SMS_17010 <br />