Laserfiche WebLink
As a part of its responsibility the SMS Supplier shall prepare and submit complete <br />and organized shop drawings, as specified herein. Interface between instruments, <br />existing control panels, motor control centers and other equipment related to the <br />Security Management System shall be included in the shop drawing submittal. <br />All drawings developed for the SCADA system shall be generated utilizing a <br />commercial CAD system and shall be delivered on CD -ROM in a DWG format, as <br />completely compatible with /readable by the latest AutoCAD software package. <br />Manuals written specifically for this project shall be generated utilizing latest version <br />of MS Word, and shall be delivered on CD -ROM. Two (2) sets of copies of all data <br />shall be provided. <br />B. During the period of preparation of this submittal, the CONTRACTOR shall authorize <br />direct, informal liaison between the SMS Supplier and the ENGINEER for exchange <br />of technical information. As a result of this liaison, certain minor refinements and <br />revisions in the Systems as specified may be authorized informally by the <br />ENGINEER, but these shall not alter the Scope of Work or cause increase or <br />decrease in the Contract price. During this informal exchange, no oral statement by <br />the ENGINEER shall be construed to give formal approval of any component or <br />method, nor shall any statement be construed to grant formal exception to or variation <br />from these Contract Documents. <br />C. Should an error be found in a shop drawing during installation or startup of <br />equipment, the correction, including any field changes found necessary, shall be <br />noted on the drawing and submitted finally "as- built" prior to acceptance of the <br />project. <br />D. The CONTRACTOR shall submit detailed shop drawings and data prepared and <br />organized by the SMS Supplier. All shop drawings shall include the letter head and /or <br />title block of the approved SMS Supplier responsible for this project. The title block <br />shall include, as a minimum, the SMS Supplier's registered business name and <br />address, project name, drawing name, revision level, and personnel responsible for <br />the content of the drawing. The quantity of submittal sets required shall be as <br />specified in Section entitled, "Contractor Submittals." The submittal shall be <br />submitted complete at one time within 30 working days after date of Notice to <br />Proceed. Any incomplete submittal will be rejected and returned without comments. <br />E. SMS Hardware: This submittal to include cameras, motion detectors, mounting <br />poles, mounting hardware, security equipment panels, Ethernet switches, DC power <br />supplies, UPSs, SMS server computer, and SMS color printer, shall be included in a <br />singular, all- inclusive submittal which shall include but not be limited to: <br />1. A complete index appearing in the front of each bound submittal volume. <br />Labeled tags shall separate system groups. <br />2. A complete system block diagram. <br />3. Corporate Yard Site Drawing, including control room and UPS room floor plan, <br />detailing existing console, equipment locations and conduit and wire <br />routing /details. <br />City of Santa Ana Security Management System General Requirements <br />Security Management System Project Page 17010 -4 <br />SantaAna_SMS_17010 <br />