Laserfiche WebLink
<br />b. Two (2) parking spaces for each unit with a size of one- <br />thousand, six-hundred and one (1,601) gross square feet up <br />to three-thousand, two-hundred (3,200) gross square feet. <br />c. Three (3) parking spaces for each unit with a size of <br />three-thousand, two-hundred and one (3,201) and larger <br />gross square feet. <br /> <br />This measure will mitigate any effects for the need for <br />additional parking capacity due to new residential development. <br />New retail in the area must apply for a ministerial C3 Parking <br />Waiver to seek permission to utilize the public parking <br />structures. One such structure is located wi thin one block <br />(within 200') of the proposed location at the northwest corner <br />of Third Street and Birch Street. Guest and consumer parking <br />will be supplied through existing street parking and existing <br />parking structure facilities. No significant impact will occur. <br /> <br />The proj ect <br />transportation; <br />of the proposed <br />the site. <br /> <br />does not directly involve alternative <br />however, a major bus terminal is within 915 feet <br />development, and a bus stop within 200 feet of <br /> <br />xv. UTILITIES/SERVICE SYSTEMS <br /> <br />A. Exceed wastewater treatment requirements of the applicable <br />Regional Water Quality Control Board? <br />B. Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br />C. Require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, <br />the construction of which could cause significant <br />environmental effects? <br />D. Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or are new <br />or expanded entitlements needed? <br />E. Result in the determination by the wastewater treatment <br />provider, which serves or may serve the project that it has <br />adequate capacity to serve the proj ect' s proj ected demand <br />in addition to the providers existing commitments. <br />F. Is the project served by a landfill with sufficient <br />permitted capacity to accommodate the project's solid waste <br />disposal needs? <br />G. Comply with federal, state and local statutes and <br />regulations related to solid waste? <br /> <br />8QA'4S3 <br />