My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1715 NORTH BRISTROL ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/05/2007
>
31A - 1715 NORTH BRISTROL ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:25 PM
Creation date
2/28/2007 12:21:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
3/5/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />W ALGREENS STORE <br />MITIGA TIONMONITORING PLAN <br />ENVIRONMENTAL REVIEW NO. 2005-208 <br /> <br />MITIGA TION MEASURE I AGENCY <br />w,o,. & IV.. 4-...... ..."'...."" Perillit. andgurillJ construction <br />· During construction, the contractor shall comply with Public Works <br />SCAQMD Fugitive Dust Rule 403 to suppress dust <br />generated by construction operations. To ensure <br />compliance with SCAQMD Fugitive Dust Rule 403, <br />grading plans and demolition plans for the proposed <br />project shall reflect the following notes: <br />o All material excavated or graded will be sufficiently <br />watered to prevent excessive amounts of dust. <br />o All clearing and earthwork activities shall cease during <br />period of high winds (winds greater than 25 mph averaged <br />over one hour) or during Stage 1 or Stage 2 smog <br />episodes. <br />o Streets surrounding the project site shall be cleaned at the <br />end of each day of construction. <br />o All material transported offsite shall either be sufficiently <br />watered or securely covered to prevent excessive amounts <br />of dust. <br />o The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br />o Equipment engines shall be maintained in good condition <br />and In proper tune according to manufacturer's <br />specifications. <br />o To the extent feasible, gasoline powered equipment shall <br />be used for onsite and offsite construction activities. <br /> <br />· The project developer shall provide proof of coverage <br />under NPDES General Construction Activity Storm Water <br />Permit that includes: (a) A copy of the project's permit <br />issued by the State Water Resource Control Board that <br />identifies the permit number, (b) Two copies of the Storm <br />Water Pollution Prevention Plan. <br /> <br />· Submit and have approved a surface drainage/utility plan <br />that depicts all applicable "Site Design" structural "Source <br />Control" and "Treatment Control" Best Management <br />Practices (BMPs) in accordance with the Orange County <br />Drainage Area Management Plan (DAMP) and the City of <br />Santa Ana Local Implementation Plan (LIP). <br /> <br />31A3'47 <br /> <br /> <br />APPROVAL <br /> <br />.. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.