My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FOUNTAIN VALLEY, CITY OF 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
FOUNTAIN VALLEY, CITY OF 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:43:12 PM
Creation date
3/21/2007 12:39:42 PM
Metadata
Fields
Template:
Contracts
Company Name
FOUNTAIN VALLEY, CITY OF
Contract #
A-2007-028
Agency
PUBLIC WORKS
Council Approval Date
2/5/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURANCE NOT REQUIRED <br />WORK MAY PROCEED <br />CLERK OF COUNCIL <br />DATE: 3 - ice} C`/ <br />(UVJ 1 i) AGREEMENT BETWEEN THE CITY OF SANTA ANA <br />AND THE CITY OF FOUNTAIN VALLEY FOR <br />REHABILITATION OF <br />EDINGER AVENUE FROM EUCLID TO NEWHOPE <br />A-2007-028 <br />This Agreement ("Agreement"), made and entered into this 21 s t day of <br />November 2006, by and between the CITY OF FOUNTAIN VALLEY, a municipal <br />corporation ("FOUNTAIN VALLEY"), and the CITY OF SANTA ANA, a charter city <br />and municipal corporation ("SANTA ANA"). <br />RECITALS: <br />A. FOUNTAIN VALLEY and SANTA ANA desire to enter into an <br />agreement to rehabilitate Edinger Avenue per the plans and specifications prepared by <br />Harris & Associates ("the PROJECT"). The PROJECT consists of pavement <br />rehabilitation, buspad construction, curb ramp construction, various other concrete <br />improvements as needed, and re -striping of the street. <br />B. The PROJECT lies partly within the corporate and jurisdictional limits of <br />SANTA ANA and partly within the corporate and jurisdictional limits of FOUNTAIN <br />VALLEY. <br />C. The parties hereto desire to each provide for the PROJECT, including the <br />preparation of plans, specifications, and related cost estimates for construction <br />(collectively "the Construction Documents"); materials testing; site survey; construction <br />engineering; construction management; construction and maintenance. <br />D. The parties desire for SANTA ANA to be responsible for preparing the <br />Construction Documents and materials testing, site construction survey, construction <br />engineering, construction management, and construction for the entire PROJECT. <br />E. The PROJECT has received the funding in the amount of $473,176 from <br />THE ARTERIAL HIGHWAYS REHABILITATION PROGRAM (AHRP). In addition, <br />the cities must provide $473,176 of local funds for the project. The funding breakdown <br />is shown in Exhibit "A". The total PROJECT cost is estimated at $1,044,182. <br />NOW, THEREFORE, the parties agree as follows: <br />1. SANTA ANA Rights and Duties: <br />a. SANTA ANA shall be the lead agency for preparing the Construction <br />Documents. <br />b. SANTA ANA shall notify FOUNTAIN VALLEY in writing of any changes, <br />increased costs, and meetings associated with SANTA ANA's lead agency <br />responsibilities for the PROJECT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.