c. SANTA ANA shall be the lead agency for materials testing, site construction <br />survey, construction engineering, construction management, and construction <br />for the PROJECT; and is authorized to hire and confer with all consulting <br />engineers and contractors relative to the materials testing, site construction <br />survey, construction engineering, construction management, and construction <br />for the total PROJECT in accordance with standard construction practices. <br />d. SANTA ANA shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of the <br />PROJECT within the jurisdictional boundaries of SANTA ANA. <br />e. All progress payments for the PROJECT shall be reviewed by SANTA ANA. <br />All work within SANTA ANA shall be per Santa Ana standard plans. <br />f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain <br />general liability and motor vehicle liability insurance in amounts satisfactory to <br />FOUNTAIN VALLEY. For any consultant contract on the PROJECT entered <br />into after the date of this "Agreement', SANTA ANA shall also cause <br />FOUNTAIN VALLEY to be named as additionally insured on insurance <br />certificates and separate endorsements for all consultant contracts related to the <br />PROJECT. Copies of such certificates and endorsements shall be provided to <br />FOUNTAIN VALLEY prior to consultants proceeding with work on the <br />PROJECT. <br />g.SANTA ANA shall advertise and award all contracts for the PROJECT in <br />accordance with federal, state and local laws. <br />h.SANTA ANA shall, in advance, notify FOUNTAIN VALLEY as to the official <br />advertising dates, bid opening date, and construction start date, and request <br />FOUNTAIN VALLEY to attend all pertinent meetings, i.e. pre-bid, pre - <br />construction, site, and final walk through. <br />BANTA ANA shall provide FOUNTAIN VALLEY final Record Drawings for <br />the PROJECT within 120 days of the completion and acceptance of construction. <br />2. FOUNTAIN VALLEY Riehts and Duties: <br />a. Change orders for work within FOUNTAIN VALLEY must receive the <br />written approval of the Director of the Public Works Agency of FOUNTAIN <br />VALLEY prior to implementation, which approval shall not be unreasonably <br />withheld. FOUNTAIN VALLEY shall have oversight inspection review <br />within FOUNTAIN VALLEY jurisdictional boundaries and shall be notified <br />of the progress of the PROJECT for such purposes. FOUNTAIN VALLEY <br />shall also have the right to enter and inspect within SANTA ANA boundaries <br />at all times for the purposes of overseeing SANTA ANA lead agency <br />functions. <br />4 <br />