My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PLANNING CENTER, THE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:02:27 PM
Creation date
3/21/2007 1:24:31 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2006-317
Agency
PLANNING & BUILDING
Council Approval Date
12/4/2006
Insurance Exp Date
7/1/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. PROJECT UNDERSTANDING <br />R <br />1. Project Understanding <br />the reQuest of the City of Santa Ana, The Planning Center is <br />pleased to respond with a scope of work and cost estimate for a <br />At <br />380-unit mixed use residential development at 2833 North <br />Bristol Street in Santa Ana. The project is already developed with <br />multifamily and commercial entities and is surrounded by residential, <br />commercial and park uses. The project applicant is Sun Cal -Heritage <br />Village, LLC. The proposed project will reQuire a Tentative Tract Map, a <br />zone change to create a new specific development district, a general <br />plan amendment and a development agreement. Due to the size and <br />scale of the project as well as the fact that demolition of existing <br />buildings will be reQuired, an Environmental Impact Report (EIR) is <br />needed to address potentially significant impacts associated with the <br />"The, 5ukea a n+ EIK was wr,ll— <br />project. <br />conS+rociad, raSaar�hod, coordinaiu! <br />We understand that the applicant has already conducted the following <br />and reflc�fod We'll on the Gt� a5 <br />studies that would be available for use in the EIR analysis: <br />+he. 'Fmpamr' of -Mir, aloarmon+ " <br />—Pam Davis, AICP <br />• Phase I Environmental Site Assessment - <br />Senior <br />City of Irvine <br />. Geotechnical Study <br />• Hydrology Study <br />The Planning Center is prepared to provide the following technical <br />analyses in support of the EIR. These studies are included in this scope <br />of work: <br />• Air Quality Analysis <br />• Cultural Resources Records Check <br />• Noise Analysis <br />• Shade and Shadow AnalysisNisual Simulations <br />• Water Quality Analysis and Hydrology Report Peer Review <br />Environmental Impact Report for the Village Green Mixed Use Residential Community THE PLANNING CENTER I Page 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.