My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PLANNING CENTER, THE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:02:27 PM
Creation date
3/21/2007 1:24:31 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2006-317
Agency
PLANNING & BUILDING
Council Approval Date
12/4/2006
Insurance Exp Date
7/1/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Methodology and Scope of Work <br />he Environmental Impact Report'(EIR) will be prepared in <br />conformance with the California Environmental Quality Act <br />"The, walifrl of work iS ezc4rrf.. <br />(CEQA), State CEQA Guidelines, and City of Santa Ana CEQA <br />The, knowle r of en✓ironm"fal <br />Guidelines. The proposed contents of the EIR and the methodology for <br />law and Procedures IS rwidutt <br />its preparation are described in the following pages: <br />This knowlede� iS eSSe,nt al when <br />de,alin$.wifh land esG <br />Preparation of the EIR <br />iSSve,S and The, Planning Gonfer <br />Task 1: Initial Study/Notice of Preparation <br />Sfaff iS wall vrwSe, in fha laws. <br />If *hero was a gVe, 'ion re?rdinaa <br />Brief written responses will be prepared for all items included on the <br />law, Plannin5-6enfer staff did no* <br />City's standard Initial Study checklist. Each response will explain the <br />heSifafe io reSaarch issvaS in the <br />basis for the No Impact, Less Than Significant Impact, Less Than <br />Significant With Mitigation Incorporation, or Potentially Significant <br />sfafufe,S. That is a $nod thin " <br />Impact response and will clearly indicate why a particular issue would not <br />—Mr. Ken Miller <br />result in a significant impact and does not require further evaluation, as <br />Director of Facilities Planning <br />Rialto Unified School District <br />y well as those issues that require further anal sis in an EIR in order to <br />fully determine the extent and significance of potential impacts and to <br />identify mitigation measures that could avoid or reduce such impacts to <br />a level of less than significant. Given the City's decision to prepare an <br />EIR for the proposed project, it is assumed for the purpose of this <br />proposal that checklist responses will consist mainly of short statements <br />that lead to further analysis to be prepared within the EIR. A complete <br />list of reference sources used to prepare the Initial Study will be <br />provided. <br />A Notice of Preparation (NOP) will be prepared, using the City's <br />standard form. A copy of the Initial Study will be attached to provide an <br />immediate explanation of the preliminary scope of issues to be included <br />in the EIR. After City approval of the NOP, The Planning Center will <br />copy and distribute the NOP via certified mail to state and local <br />agencies, surrounding property owners and other special interest groups <br />or individuals identified by the City. It is assumed that the City will <br />Environmental Impact Report for the Village Green Mixed Use Residential Community THE PLANNING CENTER I Page 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.