My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PLANNING CENTER, THE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:02:27 PM
Creation date
3/21/2007 1:24:31 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2006-317
Agency
PLANNING & BUILDING
Council Approval Date
12/4/2006
Insurance Exp Date
7/1/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. METHODOLOGY i SCOPE OF WORK <br />environmental setting, relevant regional and local planning programs will <br />be discussed to establish whether this project is consistent or <br />inconsistent with applicable planning policies and programs. More <br />detailed descriptions of existing conditions and pertinent policies will be <br />provided, where appropriate, as part of the discussions under each of <br />the specific impact topics in the main body of the EIR. Surrounding land <br />uses will be identified on a vicinity map. Based on information readily <br />available from the City of Santa Ana, development trends occurring in <br />this general area will be described, and any other major development <br />projects planned or proposed in the vicinity will be highlighted. Planned, <br />pending and approved/not built projects throughout Santa Ana will be <br />listed and total development by land use category will be Quantified. <br />Other relevant projects such as infrastructure improvements or <br />community facilities which could have a direct effect upon this project or <br />local growth trends, and which are planned to occur during the time <br />frame of the proposed project, will also be identified. <br />Task 4.2: Discussion of Existing Conditions, Environmental <br />Impacts and Mitigation Measures <br />Each topical section of the document will: (a) describe existing <br />environmental conditions and pertinent regulatory policies and programs <br />that apply to this project, (b) define the criteria by which impacts will be <br />determined to be significant, (c) determine the environmental changes <br />that would result from the project, (d) evaluate the significance of those <br />changes with respect to the impact significance criteria, (e) define <br />mitigation measures to reduce or avoid all potentially significant adverse <br />impacts, and (0 provide a conclusion as to whether significant impacts <br />would remain, even after successful implementation of recommended . <br />mitigation measures. <br />The EIR will be clearly written and will avoid the use of technical jargon <br />so that the document is easily understood. If technical terms need to be <br />introduced for accuracy, they will be clearly defined. The analysis of <br />issues will be thorough,yet concise. Practical and feasible mitigation <br />measures will be formulated which relate directly to the primary and <br />secondary effects identified in the impact sections of the document. <br />Analytical approaches to each of the EIR topics that we anticipate <br />needing to analyze are described in the following pages. <br />Aesthetics/Visual Impact/Shade and Shadow Analysis <br />The proposed project increases the density of the residential uses <br />allowed in the area and allows building heights up to 35 feet adjacent to <br />existing residential uses. As a result, The Planning Center will perform <br />Environmental Impact Report for the Village Green Mixed Use Residential Community THE PLANNING CENTER I Page 2-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.