My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-026 - Approving the Final Environmental Impact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2007
>
2007-026 - Approving the Final Environmental Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:27:01 PM
Creation date
3/27/2007 5:24:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2007-026
Date
3/19/2007
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHAPTER 4 <br /> <br />Mitigation Monitoring and <br />Reporting Program <br /> <br />4.1 INTRODUCTION <br /> <br />The Calijornia Environmental Quality Act (CEQA) requires the adoption of feasible mitigation measures to <br />reduce the severity and magnitude of potentially significant environmental impacts associated with <br />project development. The Final Environmental Impact Report (Final ElR) for the proposed Metro East <br />l\1ixed Use Overlay Zone ElR (State Clearinghouse No.2006031041) located within the City of Santa <br />Ana (City), includes prob'tam and project-specific mitigation measures to reduce the potential <br />environmental effects of the Overlay Zone, as well as the First and Cabrillo Towero Project. <br /> <br />Monitoring of the implementation of adopted mitigation measures is required by Public Resources Code <br />Section 21081.6. The Final ElR for the proposed project provides a list of mitigation measures, and <br />describes the process whereby the mitigation measures would be monitored. Following certification of <br />the Final ElR and approval of this Mitigation Monitoring Program (MMP) by the City, the mitigation <br />measures included in the Final EIR would be monitored as described in this MMP. It should be noted <br />that because this ElR contained program- and project-level components, two separate MMP tables are <br />presented as part of rhis MMP for the Overlay Zone and for the First and Cabrillo Towers project. <br /> <br />4.2 PURPOSE <br /> <br />The purpose of the proposed Overlay Zone ElR MMP is to ensure compliance with all mitigation <br />measures to mitigate or avoid potentially significant adverse environmental impacts resulting from the <br />proposed project that were identified in the Final ElR. Implementation of this MMP shall be <br />accomplished by the City of Santa Ana. Mitigation measures will be implemented (1) as part of design <br />development of the project, (2) during project construction, or (3) as part of project opetations. <br /> <br />4.3 RESPONSIBILITIES AND DUTIES <br /> <br />In general, monitoring wiD consist of demonstrating that mitigation measures were implemented, and <br />that the responsible unit monitored the implementation of the measures. The responsible unit for <br />derermining compliance with all mitigation measures will be the City. Monitoring will consist of <br />determining whether <br /> <br />. The specific issues identified in the mitigation mea5ures were considered In the design <br />development phase <br />. Construction contracts included the provisions specified in the mitigation measures <br />. The required actions specified in the mitigation measures occurred prior to or during construction <br />. Ongoing administrative activities included the provisions identified in the mitigation measures <br /> <br />Resolution No. 2007-026 <br />p::.go ~ ,...f ~&::; <br />Metro East Mixed Use Overlay ZOne (Volume III) <br /> <br />EXIIlBIT A <br /> <br />4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.