Laserfiche WebLink
<br />Chapter 4 Mitigation MonitorIng and Reporting program <br /> <br />Any concerns between monitors and construction personnel shall be addressed by the City of Santa Ana, <br />Planning Department. <br /> <br />4.4 <br /> <br />LIST OF MITIGATION MEASURES <br /> <br />As mentioned above, due to tbe ptob'Tam- and project-level components of this EIR, the MMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are listed in Table 4-1. Tbe <br />mitigation measures, which include several mitigation measures from the probrram-level component, that <br />pertain to the First and Cabrillo Towers proiect are listed in Table 4-2. All project-specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br /> <br />The mitigation monitoring matrix on the following pages is formatted to parallel the funnal of the <br />Executive Summa!)' table contained in the Final ElR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br /> <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4-2 have <br />been moclified slightly so as to clirectly apply to the First and Cabrillo Towers project. The content and <br />action required by each mitigation measure have not been modified. <br /> <br />4-2 <br /> <br />R "I. ,I;,,,, t 1 '3,-,,".1' ,-,'9R <br />Cltyllf~~ <br />