My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-026 - Approving the Final Environmental Impact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2007
>
2007-026 - Approving the Final Environmental Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:27:01 PM
Creation date
3/27/2007 5:24:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2007-026
Date
3/19/2007
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Chapter 4 Mitigation MonitorIng and Reporting program <br /> <br />Any concerns between monitors and construction personnel shall be addressed by the City of Santa Ana, <br />Planning Department. <br /> <br />4.4 <br /> <br />LIST OF MITIGATION MEASURES <br /> <br />As mentioned above, due to tbe ptob'Tam- and project-level components of this EIR, the MMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are listed in Table 4-1. Tbe <br />mitigation measures, which include several mitigation measures from the probrram-level component, that <br />pertain to the First and Cabrillo Towers proiect are listed in Table 4-2. All project-specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br /> <br />The mitigation monitoring matrix on the following pages is formatted to parallel the funnal of the <br />Executive Summa!)' table contained in the Final ElR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br /> <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4-2 have <br />been moclified slightly so as to clirectly apply to the First and Cabrillo Towers project. The content and <br />action required by each mitigation measure have not been modified. <br /> <br />4-2 <br /> <br />R "I. ,I;,,,, t 1 '3,-,,".1' ,-,'9R <br />Cltyllf~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.