My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-028 - Approving Tenative Tract Map No. 2007-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2007
>
2007-028 - Approving Tenative Tract Map No. 2007-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:27:05 PM
Creation date
3/27/2007 5:24:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2007-028
Date
3/19/2007
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c. Headway-The City should work with OCTA to review route <br />headways to determine if it would be appropriate to reduce them to <br />accommodate transit riders within the Overlay Zone. <br /> <br />64. A six inch building lateral shall be installed on-site for the purposes of <br />conveying wastewater flows from the proposed project to the existing <br />OCSD conveyance system. <br /> <br />65. The project shall implement energy conservation measures (such as <br />energy-efficient lighting and micro processor controlled HVAC equipment) <br />to reduce the demand for electricity and natural gas. The energy <br />conservation measures shall be subject to modification as new <br />technologies are developed or if current technology becomes obsolete <br />through replacement. <br /> <br />B. Police Department <br /> <br />1. Prior to issuance of a building permit, provide elevations of the parking <br />structure elevator cab and lobby enclosure to insure maximum visibility. <br />All parking structure stairwells are to be open to either the exterior or <br />interior of the structure. No enclosed stairwells will be accepted. <br /> <br />2. A security plan must be submitted to the Police Department at the plan <br />check stage for approval. The plan must cover all aspects of the projects <br />security including parking structure hours of operation (secured/open), <br />providing uniformed security guards in the lobby of the towers (security <br />desk), as well as rovers for the parking structure and grounds, a duress <br />alarm system for the parking structure and an access control system for <br />the perimeter of the building. <br /> <br />3. Prior to issuance of a building permit, the plans shall depict that resident <br />parking is physically separated from all commercial and/or guest parking. <br /> <br />4. Prior to issuance of a building permit, the plans shall note that each door <br />within the structure leading into a stairwell, lobby or storage area shall be <br />equipped with a minimum 100 square inch fire rated window. Convex <br />mirrors a minimum of 12-inches in diameter and shatterproof must be <br />installed at each stairwell landing and each corner along a walkway. The <br />last flight of stairs shall be fully enclosed at its base. Elevator lobbies <br />must be glass encased (glass entry doors) to provide the user with <br />maximum visibility. Elevator lobbies must open directly into the parking <br />garage. <br /> <br />Resolution No. 2007-028 <br />Page 22 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.