My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/02/2007
>
FULL PACKET_2007-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:36 PM
Creation date
3/28/2007 12:14:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL 2, 2007 <br />TITLE: <br />CONTRACT AWARD FOR <br />UNINTERRUPTIBLE POWER SOURCE <br />BATTERIES <br />(SPEC. NO. 07-026) <br />-2's.~~. <br />~~ CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1S` Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to MGE UPS Systems, Inc., for uninterruptible power source <br />batteries in an amount not to exceed $45,672. <br />DISCUSSION <br />The City ensures that critical facilities and operations are provided a <br />powersource back up in case of an emergency. The Santa Ana Police <br />Department and Holding Facility are equipped with back up power generators <br />in the event of a power outage. Additionally, the uninterruptible power <br />source (UPS) batteries are maintained to bridge from the main power to the <br />back up power generators to insure that the power supply is not <br />interrupted. <br />There are four areas equipped with the UPS batteries: <br />center, the jail electronic security system, and the <br />both the police administration building and the holding <br />still functional, the existing UPS batteries installed <br />their recommended lifespan. The contract will provide <br />replacement of 192 batteries and connection cables. <br />the 9-1-1 dispatch <br />computer rooms for <br />facility. Although <br />in 2001 have reached <br />for the removal and <br />6 Invitations For Bid mailed <br />1 Invitation For Bid mailed to a Santa Ana vendor <br />5 Bids received <br />1 Bid received from a Santa Ana vendor <br />Bids were received, opened on March 7, 2007 and evaluated (Exhibit 1). The <br />bid received from MGE UPS Systems, Inc., is responsive to the specification <br />and meets the City's requirements. <br />22D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.