My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Construction Contract to BNS Construction for the Fire Station 70
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 17 - Construction Contract to BNS Construction for the Fire Station 70
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:35:33 PM
Creation date
3/26/2025 9:07:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Station 70 ADA Restroom Remodel and Generator Replacement <br />April 1, 2025 <br />Page 2 <br />Proiect Schedule and Contract Time <br />The project completion date is March 2026, barring unforeseeable conditions such as <br />rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The contract for this project is 150 working days, as specified in the bid <br />documents. Working days are counted in accordance with the City's Standard <br />Specifications, which exclude weekends, City -observed holidays, and inclement <br />weather days that prevent work. The projected project schedule is provided below: <br />Project Milestones <br />Milestone <br />Estimated <br />Notes <br />Completion Date <br />Administrative Startup <br />April 2025 <br />Contract execution, bonds, <br />insurance <br />Material Procurement <br />April -August 2025 <br />Procurement for long lead items <br />(panel, generator, automatic <br />transfer switch, electrical fixtures <br />Contractor Mobilization <br />August 2025 <br />Start of construction activities <br />Project Completion <br />March 2026 <br />Based on 150 working days <br />Project Phasing <br />The contractor will be constructing this project in one singular phase, fulfilling the scope <br />of work as outlined in the contract documents. Due to the long lead times in securing <br />project materials, on -site work will not commence until materials have been secured <br />(approx. August 2025). The contractor is responsible for determining the scheduling and <br />sequencing of activities based on their proposed means and methods. <br />Public Outreach <br />Construction will be confined to the fire station, ensuring that the community and <br />neighborhoods remain unaffected. Staff has continuously met with OCFA to discuss the <br />impact on their fire station. The contractor and staff will coordinate with OCFA <br />throughout the project construction and will install signage at the project site indicating <br />project details and contact information. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Review No. ER-2025-11 was <br />filed for the project 24-6626 (Exhibit 4). <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $716,250. All funds are available for expenditure in Fiscal Year 2024-2025. <br />Any remaining balances not expended at the end of the fiscal year will be presented to <br />City Council for approval to carry forward to Fiscal Year 2025-2026 (Exhibit 5). <br />
The URL can be used to link to this page
Your browser does not support the video tag.