Laserfiche WebLink
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 14 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br />April 1, 2025 <br />TOPIC: Purchase One 2025 Ford F-600 Regular Cab Utility Service Body Truck <br />AGENDA TITLE <br />Purchase Order Contract to PB Loader Corporation for One 2025 Ford F-600 Regular <br />Cab Utility Service Body Truck (Specification No. 25-031) (Non-General Fund) <br />RECOMMENDED ACTION <br />Approve a purchase order to PB Loader Corporation for one, new/unused 2025 Ford F- <br />600 Regular Cab Utility Service Body Truck, in an amount of $245,023, plus a <br />contingency amount of $15,000, for a total amount not to exceed $260,023. <br />GOVERNMENT CODE §84308 APPLIES: No <br />DISCUSSION <br />The Public Works Agency’s (PWA) Parks, Fleet, and Facilities Division is responsible <br />for the acquisition, maintenance, repair, and replacement of vehicles, trucks, and <br />maintenance equipment. The Fleet Services team maintains an equipment replacement <br />schedule and works with departments to routinely replace vehicles that have surpassed <br />their useful life cycle. <br />The PWA Water Resources Division (Water Resources) manages and maintains the <br />operations of Santa Ana’s water and sanitary sewer systems. Water Resources <br />currently utilizes a 2014 F-550 for daily operations by the Sewer System Maintenance <br />team. The existing vehicle, the 2014 F-550, was evaluated in accordance with the City’s <br />Equipment Replacement Policy (Exhibit 1), which defines the review process when an <br />equipment is no longer economically operated and maintained. Based on the equipment <br />lifecycle guidelines, the existing vehicle has reached its useful lifecycle of 10 years. <br />Water Resources is requesting to replace the vehicle with a new 2025 Ford F-600 which <br />includes additional on-board equipment, including a larger-capacity air compressor for <br />powering pneumatic tools used at jobsites such as jackhammers, tampers, and <br />grinders, as well as an on-board electrical generator to power worksite lighting and <br />charge batteries for power tools. These upgrades will reduce the need for a secondary <br />vehicle and/or crew at a jobsite and is a more efficient method of maintaining the high- <br />quality sewer services provided to Santa Ana residents and businesses.