My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS, INC
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
P & D CONSULTANTS, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:01:53 PM
Creation date
6/8/2007 2:19:51 PM
Metadata
Fields
Template:
Contracts
Company Name
P & D CONSULTANTS, INC
Contract #
A-2007-071
Agency
Planning & Building
Council Approval Date
4/2/2007
Insurance Exp Date
4/1/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Pedro Guillen <br />March 8, 2007 <br />The EIR will be prepared in accordance with the California Environmental Quality Act (CEQA) of 1970, <br />as amended (California Public Resources Code Section 21000, et sec.), and CEQA Guidelines <br />(California Code of Regulations Section 15000, et seq.). The following are the key work program <br />tasks required to successfully prepare and process the EIR for the proposed project. <br />Scope of Work <br />Task 1.0 Technical Studies <br />Technical studies will be prepared in support of the EIR for Air Quality, Noise, and Traffic. P&D <br />assumes that the applicant will provide the previously prepared Geotechnical Study and Hydrology <br />Study and that these technical studies will be sufficient to address potential impacts of the 29-story <br />Sky Lofts Project building related to these environmental parameters. P&D assumes that the City will <br />review and approve these studies. <br />Air Quality Impact Analysis <br />P&D will provide an air quality impact analysis (AQIA) study for the Sky Lofts Project. The AQIA will <br />primarily follow the evaluation methods and criteria developed by the South Coast Air Quality <br />Management District (SCAQMD) as outlined in the SCAQMD CEQA Air Quality Handbook, dated <br />1993, and all supplemental policies. <br />P&D will estimate emissions associated with the construction phase of the proposed project. Emission <br />estimates will be used to evaluate the Sky Lofts Project for conformity with the SCAQMD Air Quality <br />Management Plan (AQMP). P&D will work with the City to accumulate detailed information on the <br />project construction, including construction phasing and heavy equipment requirements. Emissions <br />will be calculated for criteria pollutants and toxic air contaminants (TAC) emissions, where information <br />is available. The emissions estimates will be based on information provided by the project design <br />team with regard to construction requirements, andiorwill be developed based on standardized <br />approaches as presented in the CEQA Handbook for construction of mixed -use developments. P&D <br />will then evaluate the significance of project emissions based on significance thresholds as presented <br />in the CEQA Guidelines checklist. Where required, P&D will evaluate mitigation measures that may <br />reduce potential impacts associated with construction activities. The proposed project will also be <br />analyzed for consistency with applicable air quality and transportation planning programs, as <br />appropriate. <br />Air quality analysis for the City Place Project EIR included a carbon monoxide (CO) Hot Spots analysis <br />for seven (7) intersections. To evaluate project compliance with short-term CO standards, the EIR will <br />include CO Hot Spots evaluation for the 7 intersections included in the City Place Project EIR, or as <br />appropriate pending the traffic analysis. <br />P&D will provide a preliminary draft for review and comment, a final draft for review and comment, and <br />a final AQIA for the EIR. <br />Noise Technical Study <br />Weiland Associates, Inc. will prepare a noise technical study for the EIR that will include the following: <br />• A survey of the study area to identify the location of the noise sources in the area. <br />• Definition of significance criteria for the project based on the CEQA Guidelines checklist, the City's <br />General Plan standards, and the City's noise ordinance standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.