My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS, INC
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
P & D CONSULTANTS, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:01:53 PM
Creation date
6/8/2007 2:19:51 PM
Metadata
Fields
Template:
Contracts
Company Name
P & D CONSULTANTS, INC
Contract #
A-2007-071
Agency
Planning & Building
Council Approval Date
4/2/2007
Insurance Exp Date
4/1/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />Pedro Guillen <br />March 8, 2007 <br />Site -Specific Traffic Analysis <br />Analysis of the following site -specific, traffic -related items will be included in the traffic analysis, unless <br />it is determined in consultation with the City of Santa Ana that an item is not required. <br />• General project access assessment. <br />• Geometric configuration/striping. <br />• On -street parking impacts. <br />• Parking structure operations. <br />• Delivery truck access. <br />• Neighborhood impacts. <br />• Pedestrian circulation. <br />Report Preparation <br />P&D will prepare three hard copies of the Draft Traffic Study. The Draft Traffic Study will be revised <br />(as appropriate) per City comments and three hard copies of the Final Traffic Study will be submitted. <br />Sewer Study <br />Metcalf & Eddy (M&E) wilt prepare a sewer study for the EIR that will include the following: <br />Assumptions <br />• Prior work by the M&E main sewer modeler on the Orange County Sanitation District (OCSD) <br />Strategic Plan Update J-101 establishes M&E's understanding of the complex nature of the <br />OCSD collection system. <br />o The main assumption for this study is that M&E will have access to OCSD's Info. <br />Works Model to facilitate the current and future scenario analysis. <br />o If the OCSD Info. Works Model is not provided, significant model -built and calibration <br />will be required to provide an adequate basis for analysis. M&E does not expect that <br />OCSD will provide a model of the entire system, rather the ability to view the entire <br />system in order to prune out the extent necessary to perform the analysis. <br />• OCSD operates many diversion structures which can route flows through their system in many <br />ways. The model extent will be determined such that normal operating conditions can be <br />simulated with the use of an inflow file at the pruned edges of the model. It cannot be expected <br />that the inflow files will include all of the possible upstream flow conditions. <br />Project Management <br />This task consists of drafting internal schedule and work plans, client meetings and progress reports, <br />and quality assurance/quality control measures. <br />Data Acquisition <br />M&E will gather and review available background data on the OCSD collection system as well as <br />member agency systems affected by the proposal. OCSD and member agency master plans, county <br />and member agency land use and general plan data and reports will be needed. If the OCSD model <br />
The URL can be used to link to this page
Your browser does not support the video tag.