Laserfiche WebLink
Page 6 <br />Pedro Guillen <br />March 8, 2007 <br />is not provided, physical system data will be required to build the model. It is assumed that the data is <br />readily available and the district will assist with gathering the data. <br />Flow Generation <br />If the OCSD model is provided, M&E will review current (2005) and future model population, <br />employment, and commercial flow inputs and update them where they do not match current and future <br />conditions. Average and peak day dry weather flows, unit flow factors, and demand patterns will be <br />established for current and future conditions based on the OCSD model and member agency data <br />provided. Average and peak day wet weather flows will be based on the OCSD model or other master <br />plan data. M&E will develop flow scenarios to match current conditions without the proposed project, <br />current conditions with the proposed project; 2010 conditions with the proposed project; and <br />2030/Buildout conditions with the proposed project. <br />Model Build <br />If the OCSD model is provided, this task is considerably easier and only involves determining the <br />model extent necessary. If no OCSD model is provided, this task involves building a model with pipes, <br />manholes, and sewersheds that cover the member agency and OCSD sewers based on the <br />determined model extent. <br />Capacity Evaluation <br />M&E will perform capacity simulations with the updated Info. Works model for the following 4-6 main <br />scenarios (a total of 8-10 with wet weather runs): <br />• Current conditions without proposed City Place Sky Lofts development (2006-2007). Current <br />conditions with proposed City Place Sky Lofts development (2006-2007). <br />• Future conditions without proposed City Place Sky Lofts development (2010, and possibly 2030). <br />• Future conditions with proposed City Place Sky Lofts development (2010, and possibly 2030). <br />Present EIR Impact <br />A full analysis of the impacts to the OCSD and member agency sewers will be performed. The results <br />of the analysis will be conveyed with text, tables, graphs, figures, and maps. The deliverable of this <br />task will be a memorandum or short report. <br />It should be noted that if assumptions above hold true, it is anticipated that the study can be <br />completed within 30 to 45 calendar days from the notice to proceed. If assumptions do not hold true, <br />M&E anticipates the study will require 45 to 60 days to complete. <br />Water Assessment (Not Included) <br />A water assessment is not included in the scope of work, as P&D's review of Senate Bill (SB) 221 and <br />SB 610 indicates that they would not apply to the Sky Lofts Project. <br />Shade -Shadow Analysis <br />P&D will conduct a shade -shadow analysis of the Sky Lofts Project building. Figures will be prepared <br />with computer software that will show the shadow patterns cast by the building during summer and <br />