Page 11 <br />Pedro GuillBn <br />March 8, 2007 <br />Task Deliverables <br />• Provide the City with one electronic copy Draft RTC and five hard copies containing the following <br />o Overview/Explanation of RTC document. <br />c Bracketed comment letters organized by type of originator <br />o Corresponding responses to bracketed comment letters. <br />• Incorporate all revisions to the Draft RTC and submit a revised Draft RTC in electronic format to <br />the City. <br />• Incorporate revisions and comments on second Draft RTC and finalize the RTC. <br />• Produce 20 hard copies of the RTC. <br />• Send a copy of the RTC via receipt verification mail to each public agency which commented on <br />the DEIR in a manner by which it will be received at least 10 days prior to certification of the Final <br />EIR. <br />Task 7.0 Final EIR <br />7.1 Preparation of the Final EIR <br />P&D will prepare a Final EIR that contains a list of commentors, comment letters and responses to <br />comments, as well as any other pertinent information for the project record, such as any corrections, <br />by reference, to the DEIR. Any revised mitigation measures or addenda to the DEIR, which may be <br />solicited through public review or required by the City, will be incorporated by P&D into a revised DEIR <br />text. <br />Task Deliverables <br />• Compile and deliver 30 hard copies and 30 CD's of the Final EIR, consisting of the elements <br />identified below: <br />o DEIR. <br />o RTC. <br />o Mitigation Monitoring and Reporting Program (MMRP) as described under Task 7.2. <br />o Clarifications, if necessary. <br />o Statement of Facts and Finding/Statement of Overriding Considerations as described <br />under Task 7.3. <br />o Any other attachments identified by the City <br />o It is assumed that City staff will prepare the staff reports and resolutions for the <br />Planning Commission and City Council. <br />7.2 Mitigation and Monitoring Program <br />P&D will prepare the MMRP based on the analysis conducted in the EIR. The MMRP will be <br />presented for adoption at the time of the CEQA Facts and Findings. A draft MMRP will be prepared, <br />per City direction, during preparation of the DEIR. The Final MMRP will be prepared concurrently with <br />the preparation of the Final EIR and the RTC. The MMRP will be designed to ensure compliance with <br />adopted mitigation requirements during project implementation. In coordination with City staff, P&D <br />will prepare the MMRP for mitigation measures that address significant adverse project impacts or are <br />adopted as conditions of approval. <br />