My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-07-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
07/02/2007
>
FULL PACKET_2007-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:38:57 PM
Creation date
6/27/2007 12:03:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />CLERK OF COUNCIL USE ONLY: <br />JULY 2, 2007 <br />TITLE: <br />CONTRACT RENEWAL FOR <br />SIDEWALK MAINTENANCE <br />(SPEC. NO. 06-102) <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1s~ Reading <br />^ Ordinance on 2ntl Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For <br />~~-Gc/ <br />CI Y MANAGER <br />RECOMMENDED ACTION <br />CONTINUED TO <br />FILE NUMBER <br />Renew the contract with Channel Islands Sawing for sidewalk maintenance for <br />a one-year period in the annual amount not to exceed $50,000. <br />The Public Works Agency's Maintenance Services Division (PWA) is <br />responsible for maintaining the sidewalks of Santa Ana. PWA evaluates the <br />condition of the sidewalks, and identifies uneven surfaces, cracks and <br />holes that need repairing. Once identified, the repair work is contracted. <br />Offset grinding is the preferred method to repair uneven surfaces caused by <br />underlying tree roots that raise sidewalk areas, resulting in risks to <br />pedestrian traffic. During the previous contract term, 830 sidewalk areas <br />were repaired using offset grinding. A separate contract is used to repair <br />cracks and holes in sidewalks. <br />On August 7, 2006, the City Council awarded a contract to Channel Islands <br />Sawing for a one-year period with provision for three, one-year renewals. <br />The vendor has performed satisfactorily during the past contract period and <br />has agreed to renew the contract without an increase in pricing. Staff <br />recommends the first renewal of the contract. <br />FISCAL IMPACT <br />Funds are available in the proposed fiscal year 2007-2008 Public Works Road <br />Maintenance Other Contractual Services account (account no. 11-631-6291). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />s G. Ross ~ Francisco Gutierrez <br />utive Director Executive Director <br />is Works Agency Finance & Mgmt. Services Agency <br />JGR/WO/06-102R1.9:uc 2 2 E '1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.