My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UNITED INSPECTION & TESTING 3 - 2000
Clerk
>
Contracts / Agreements
>
U
>
UNITED INSPECTION & TESTING 3 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2020 12:18:41 PM
Creation date
7/5/2007 8:11:16 AM
Metadata
Fields
Template:
Contracts
Company Name
United Inspection & Testing
Contract #
A-2000-064
Agency
Public Works
Insurance Exp Date
7/1/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />'- <br /> <br />...., . <br /> <br />. When soils and asphal t concrete are <br />si te, R-value and asphalt extraction <br />within 96 hours. <br /> <br />sampled at the job <br />should be submitted <br /> <br />Independent Assurance Sampling and Testing <br /> <br />The selected firm shall provide an Independent Sampling <br />and Testing (ISAT) program <br /> <br />. To verify <br />materials <br />samplers. <br /> <br />that the project's sampling and <br />is performed correctly by the <br /> <br />testing <br />testers <br /> <br />of <br />and <br /> <br />. To ensure the equipment is properly calibrated. <br /> <br />. To provide the City with a copy of the program so that the <br />Resident Engineer may verify that the program is carried <br />out. <br /> <br />. To provide the Resident Engineer with an immediate re- <br />port, including action to be taken by the accepted testing <br />laboratory, when poor comparisons are noted between ISAT <br />and acceptance tests (AT) so that the Resident Engineer <br />can follow-up on the proposed actions until the discrepan- <br />cies have been resolved. <br /> <br />IV. CITY' S RESPONSIBILITIES <br /> <br />1. Furnish construction plans and specifications to the <br />consultant. <br /> <br />2. Coordinate with the contractor regarding work schedule and <br />notify the consultant 24 hours in advance for the required <br />inspections and tests. <br /> <br />V. ISSUING OFFICE <br /> <br />Santa Ana Public Works Agency, the Executive Director's <br />office at 20 Civic Center Plaza, Ross Annex, Santa Ana, <br />California 92702. City's representative is Michel Girgis, <br />Associate Engineer, (714) 647-5042 for information regarding <br />this RFP. <br /> <br />VI. SCHEDULE <br /> <br />Proposals are due in the office of the Executive Director of <br />Public Works Agency before 5;00 p.m. on March 10, 2000 to <br />the attention of Mr. James G. Ross, Executive Director of <br />Public Works Agency at 20 Civic Center Plaza, Ross Annex, <br />Santa Ana, California 92702. <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.