Laserfiche WebLink
<br />NEW MISCELLANEOUS FEES <br /> <br />PARKS, RECREATION A;\l) COMIVIUNITY SERVICES AGENCY <br /> <br />I) Stadium Reutal- Commercial Eveuts, West Graudstaud Ouly <br /> <br />Proposed Feels): <br /> <br />S5,043, I i per day <br /> <br />Department: Park Selvice5. <br /> <br />Cunently, both Stadium grandstands can be rented for commercial events at a cost of $10,086.34 ;.10 fee exists 1'01 <br />those wishing to rent only the west grandstand. This fee will make the Stadium a more attractive venue for sma lie] <br />events. Typical renters may ulclude coacerts and speaking events where oaly a 4.500 seatiag capacity is required. <br /> <br />2) Stadinm Rental- Commercial Eveats, We.st Graadstand and Field Level Seating <br /> <br />Proposed Feels): <br /> <br />Si.564.i6perday <br /> <br />Depart/llent: Park Services <br /> <br />Cunently. both Stadi\lln grandstaads caa be rented for commercial eveats at a cost of $10.086.34. ;.10 fee exists fa] <br />those wishulg to rent only the west grandstand and field level seating. This fee will make the Stadium a Illore <br />attractive venne for smaller events. Typical renters may include COlleerts and speaking events where only n 4.S0C <br />grandstand seating capacIty and UOO field seating capacity are required. Fee does not include set-up of synthetic turt <br />protective covering. which will be based au actlW] set-up costs. <br /> <br />3) Stadium Rental- Commercial Eveats, Both Graadstands aad Field Level Seating <br /> <br />Proposed Feels): <br /> <br />$15.129.51 per day <br /> <br />Departmel/r: Park Services <br /> <br />Clmently, both Stadi\lln grandstands can be rented for connnercial events at a cost of $10,086.34. ;.10 fee exists 1'01 <br />those wishing to rent both grandstands and field level seating. The Stadi1\lll seating capacity is 8.500. This fee wouk <br />allow an additional 3.000 seals on the Sladilllll field. Typical renters nwy include conceITs and speaking evems where <br />a I UOO seating capacity is requu'ed. Fee does not include set-up of synthetic mrf protective covenng, which will b( <br />based on actual set-np costs. <br /> <br />62 <br /> <br />Resolution No. 2007-046 <br />Page 66 of 73 <br />