Laserfiche WebLink
4.5 At the beginning of cleaning operations, the Contractor shall strategically place <br />approved signage at appropriate locations to identify to patrons that cleaning is <br />taking place and that the walkways may be slippery. At all times Contractor shall <br />safe guard the public from conditions made unsafe by the Contractor's operations. <br />4.6 During cleaning operations should the Contractor notice a hazardous condition, <br />Contractor shall make the area safe by barricading the area and notifying the <br />Executive Director's representative immediately. It shall be the City's <br />responsibility to remedy the unsafe condition unless the Contractor created the <br />condition. <br />4.7 In the event of hazardous condition originating after or between cleaning <br />frequencies, the Contractor may be requested to respond to the site and remove <br />the hazard. Such requests shall be paid under Additional Work. <br />4.8 The nozzle pressure of equipment shall not be so great so as to dislodge tile/paver <br />grout or cause damage to hardscapes. <br />4.9 If the nozzle pressure of equipment used to loosen and clean hardscapes is <br />Insufficient to thoroughly wash the surface, scrub brushes and cleaners may be <br />require to remove the materials and produce a thoroughly clean surface. <br />4.10 All cleaned surfaces shall be rinsed clean and no fine grit or grime shall be <br />allowed to remain. <br />4.11 Glass surfaces, which get wet as a result of cleaning operations, shall be <br />hand -dried immediately after the conclusion of the operation in the immediate <br />area. <br />4.12 Immediately following the cleaning of the hardscape areas, all materials generated <br />by the operation shall be collected and placed in Contractor's trash containers or <br />otherwise removed from the site. <br />4.13 All areas barricaded while drying shall be opened by Contractor and made <br />available for use when the area(s) are completely dry. <br />5• Special Considerations: <br />5.1 The Plaza of the Sun, Plaza of the Flags, and Plaza of the Fountains have tar <br />bubbling through the seams in the pavement. The Contractor shall remove the tar <br />in these areas and clean up any residue that the tar leaves, leaving the pavement <br />clean and unblemished. <br />5.2 The North Orange County Courthouse reflection pool has a terrazzo finish. In <br />(C <br />