Laserfiche WebLink
<br />Page 32, Item a - remove the following langoage: graffiti eradication/over painting of bleachers, backboards, <br />fencing, signs, etc. <br /> <br />Page 33, Item 12-<: _ change to read as follows: Once a week the Contrae":,r shall lDp dress unlevel<:</ areas ~f the <br />sport turf playing areas using #20 Silica Sand or approved product Apply WIth an approved top dressmg machine <br />that will achieve a level playing surface. <br /> <br />Page 33, Item 14-a - cbange to read as follows: All trash and debris on the ground or in trash receptacles shall be <br />removed from all worksites each day, Monday through Sunday, between 6:00 a.m. and 12:00 p.m. <br /> <br />Page 34, Item 16 - Special Maintenance, insert the following as Items b through f: <br />b) Jerome Park - Center Street, between the existing posts shall be the contractor's responsibility to <br />maintain. Also, Center Street parking lot between McFadden Avenue and the posts lD the south are the <br />Contractor's responsibility. <br />c) Centennial Park - The fire training facility landscaping is a part of this agreement. The area of <br />landscaping immediately south of the drive entrance off Fairview Street is also part of this agreement. <br />The landscaping immediately adjacent to the school parking structure shall not be a part of this <br />agreement. <br />d) Cahrillo Tennis Center- The vacant lot to the south is the ContraclDr's respousibility. <br />e) Fisher Park - fire pits shall be cleaned by the Contractor daily. <br />t) Santiago Park Lawn Bowling Greens - Contractor shall be required to mow both greens three times <br />per week using a real mower provided by the City. <br /> <br />Page 35 - insert the following language as Section IV Reduction or Addition To &:ope of Work: Any <br />additions or reductious to the Contractor's scope of services shall he negotiated by the City of Santa Ana. <br /> <br />Page 41, Item 4.1.1: remove reference to ''Corona Clay Products Angel Mix" and replace with "West Coast Sand <br />and Gravel Stabilizer Pro-Gold Infield Mix." <br /> <br />Page 41, Item 4.2.1: remove reference to "Corona Clay Products Mound Mix" and replace with Stabilizer <br />Solutions Hill topper Mound Mix," <br /> <br />Page 44, Item 7.5.1: remove reference to "Angel Mix" and replace with "West Coast Sand And Gravel Stabilizer <br />Pro-Gold Mix," <br /> <br />Page 46, Item 8.1.3: remove reference to "Angel Mix" and replace with "West Coast Sand And Gravel Stabilizer <br />Pro-Gold Mix." <br /> <br />Page 46, Item 10.1.1: remove reference In "Angel Mix" and replace with "West Coast Sand And Gravel Stabilizer <br />Pro-Gold Mix." <br /> <br />Page 47, Item 10.1.3: remove reference to "Angel Mix" and replace with 'West Coast Sand and Gravel Stabilizer <br />Pro-Gold Mix." <br /> <br />Page 47, Add Item 12.1.4: All turf (infield, outfield, fence lines, warning tracks, etc.) shall be edged one (1) time <br />per week using equipment approved by the Director. <br /> <br />The foUowinf! were issues raised durinf! the Dre-oTOoosal conference and addressed bv Cih staff: <br /> <br />Page 11 ~ Specialized Services: City staff darjfied thilt F.ailure to Perform costs will be based on the hourly wage <br />rate specified by the contractor in this area. Amount will be deducted from monthly invoice. In addition, a penalty <br />up to 5300 will be assessed when inspections conducted show apparent Failure to Perform. <br /> <br />What amount, on the average, has City withheld from contractors in the past for failure to perform? <br />Do not have specific dollar amount at this time. It is assumed that the contractor chosen will perform high <br />quality work a.nd will possess the resources to meet the minimum specifications. <br /> <br />Does the Parks, Recreation & Community &:rvices Agency have the capaelt)' to puslt through a bid that isn't <br />the lowest? <br />Yes. The Parks and Recreation Agency has selected the RFP process. as opposed to a bid, as the <br />procurement tooL to select the landscape contractors. <br />