My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JONES & STOKES ASSOCIATES, INC. 09
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
I-J (INACTIVE)
>
JONES & STOKES ASSOCIATES, INC. 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:52:57 PM
Creation date
8/4/2007 8:20:52 AM
Metadata
Fields
Template:
Contracts
Company Name
JONES AND STOKES ASSOCIATES, INC.
Contract #
A-2007-157
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
10/1/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K O A C o r p o r a t i o n <br />PROPOSED SCOPE OF SERVICES for the <br />Traffic Impact Study Proposal <br />for the Draft EIR Metro East Mixed Use Overlay Zone <br />In The City Of Santa Ana -Addendum <br />The following scope of services, schedule and fee apply to a traffic study update to analyze additional <br />concerns that the City of Tustin has raised within the letters sent to the City on April 11, 2007 and May <br />14, 2007; specifically: <br />QL Prepare an exhibit that shows the traffic volume distribution in trips on arterial links within the <br />Old Town Tustin area — namely El Camino Real, Pacific Street, Myrtle Avenue, "B" Street, and <br />Amaganset Way. Also show project trips on arterial streets bounded by Newport Avenue, 17th <br />Street, SR 55 Freeway, and 1-5 Freeway. <br />4- Include an analysis of Main Street between Elk Lane and Newport Avenue. This street segment <br />is identified as a Secondary Arterial roadway in the Tustin General Plan. This arterial was not in <br />the original SOW for the Draft EIR, but the City of Tustin wishes it to be analyzed at this time <br />due to the constrained right-of-way where Main Street traverses under the 1-5 Freeway Bridge <br />(which results in a narrow configuration). <br />4- Provide traffic counts and analysis of the following intersections: Main Street/Pacific Street, Main <br />Street/"B" Street, Main Street/El Camino Real, Main Street/Newport Avenue, and Seventeenth <br />Street/Prospect Avenue <br />These items are included in the Scope of Services provided below. <br />SCOPE OF SERVICES <br />The Scope of Services is intended to mutually meet both Cities' requirements for analysis of traffic <br />impacts associated with the proposed development. <br />Task 1 — Study Orientation and Scope Refinement <br />KOA senior staff will discuss the normal and unique traffic aspects of the project and study <br />requirements with the City Traffic Engineer. <br />Task 2 — Data Collection <br />Peak period intersection turning movement counts will be collected for 5 intersections during the AM <br />and PM Peak hours: <br />4- Main Street at Pacific Street <br />4- Main Street at "B" Street <br />4- Main Street at El Camino Real <br />TRAFFIC IMPACT STI-DY PROPOSAL — ADDENDUM FOR THE <br />I�rujt EIR dletro East _,WjXed U.Se Zone Overlay Project in the City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.