My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JONES & STOKES ASSOCIATES, INC. 09
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
I-J (INACTIVE)
>
JONES & STOKES ASSOCIATES, INC. 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:52:57 PM
Creation date
8/4/2007 8:20:52 AM
Metadata
Fields
Template:
Contracts
Company Name
JONES AND STOKES ASSOCIATES, INC.
Contract #
A-2007-157
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
10/1/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K O A C o r p o r a t i o n <br />4- Main Street at Newport Avenue <br />4- Seventeenth Street at Prospect Avenue <br />Twenty-four hour traffic counts will be obtained on the following streets: <br />4, El Camino Real between First Street and Newport Avenue <br />4, Pacific Street between First Street and Main Street <br />i- Myrtle Avenue between First Street and Main Street <br />Q.- "B" Street between First Street and Main Street <br />Q;- Amaganset Way between Prospect Street and Yorba Street <br />The counts will be taken by personnel of KOA or by a traffic count specialist, Traffic Data Services of <br />Santa Ana or The Traffic Solution of Arcadia depending upon project scheduling and availability. If any <br />additional arterial intersections must be analyzed, extra work compensation may be requested. Traffic <br />counts and forecasts for other intersections in the area of concern will be obtained from the Metro East <br />Mixed Use (MEMU) Overlay Zone EIR study. <br />KOA will also review the location and intersections in the field to observe and inventory roadway <br />geometries, existing traffic operation, and relevant information during peak hours. <br />Task 3 — Analysis Methodology <br />In order to produce properly calibrated Level of Service results, the Level of Service analysis will be <br />based upon SYNCHRO, a traffic signal operations analysis tool. This is expected to include Irvine <br />Boulevard/4th Street from Tustin Avenue to Yorba Street and all signalized intersections in Tustin to be <br />analyzed. <br />Task 4 — Report Preparation <br />KOA will prepare a traffic study for the development proposal. The study will present all information <br />prepared by KOA, including: <br />I. Existing Traffic Conditions <br />II. Project Related Traffic Volumes <br />III. Future Traffic Conditions <br />IV. Traffic Impact <br />V. On -site Circulation <br />VI. Mitigation/Recommendations <br />VII. Conclusion <br />The future traffic conditions will include the Draft EIR Metro East Mixed Use Overlay Zone project. <br />The study will address traffic conditions at all relevant intersections required by the County Congestion <br />Management Plan and City guidelines. <br />TRAFFIC' IMPACT STI.D}PROPOSAL — ADDENDUM FOR THE Z <br />Draft Elk :Metro East Mixed Use Zone Overlay Project in tke Ci7)l of Satrta Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.