Laserfiche WebLink
K O A C o r p o r a t i o n <br />4- Main Street at Newport Avenue <br />4- Seventeenth Street at Prospect Avenue <br />Twenty-four hour traffic counts will be obtained on the following streets: <br />4, El Camino Real between First Street and Newport Avenue <br />4, Pacific Street between First Street and Main Street <br />i- Myrtle Avenue between First Street and Main Street <br />Q.- "B" Street between First Street and Main Street <br />Q;- Amaganset Way between Prospect Street and Yorba Street <br />The counts will be taken by personnel of KOA or by a traffic count specialist, Traffic Data Services of <br />Santa Ana or The Traffic Solution of Arcadia depending upon project scheduling and availability. If any <br />additional arterial intersections must be analyzed, extra work compensation may be requested. Traffic <br />counts and forecasts for other intersections in the area of concern will be obtained from the Metro East <br />Mixed Use (MEMU) Overlay Zone EIR study. <br />KOA will also review the location and intersections in the field to observe and inventory roadway <br />geometries, existing traffic operation, and relevant information during peak hours. <br />Task 3 — Analysis Methodology <br />In order to produce properly calibrated Level of Service results, the Level of Service analysis will be <br />based upon SYNCHRO, a traffic signal operations analysis tool. This is expected to include Irvine <br />Boulevard/4th Street from Tustin Avenue to Yorba Street and all signalized intersections in Tustin to be <br />analyzed. <br />Task 4 — Report Preparation <br />KOA will prepare a traffic study for the development proposal. The study will present all information <br />prepared by KOA, including: <br />I. Existing Traffic Conditions <br />II. Project Related Traffic Volumes <br />III. Future Traffic Conditions <br />IV. Traffic Impact <br />V. On -site Circulation <br />VI. Mitigation/Recommendations <br />VII. Conclusion <br />The future traffic conditions will include the Draft EIR Metro East Mixed Use Overlay Zone project. <br />The study will address traffic conditions at all relevant intersections required by the County Congestion <br />Management Plan and City guidelines. <br />TRAFFIC' IMPACT STI.D}PROPOSAL — ADDENDUM FOR THE Z <br />Draft Elk :Metro East Mixed Use Zone Overlay Project in tke Ci7)l of Satrta Ana <br />