Laserfiche WebLink
V ,r 0 • <br />Day = a calendar day unless otherwise specifically designated. <br />Designated City Representative = Deputy City Manager for Development Services, or designee <br />Consultant(s) = Consultant(s) hired by Program Manager pursuant to this Agreement (e.g. <br />architect, engineer, etc.). <br />Consultant(s) Agreements = the contracts executed between Program Manager and its <br />Consultant(s). <br />Construction Management Agreement = the agreement entered into by and between Program <br />Manager and its Construction Manager providing for Project construction management services. <br />Construction Manager = The construction manager designated by Program Manager to supervise <br />and manage the construction of the Project by the Contractors. <br />Project Budget (Attached hereto as Exhibit A) = $259,424 (includes all work as shown on <br />Exhibit A and Project Documents) the total cost of Project, including the costs of engineering and <br />constructing the Project (including construction management services to be provided by Program <br />Manager's designated Construction Manager). The Project Budget includes costs for (i) the fees <br />and allowed reimburseables of Program Manager under this Agreement including without <br />limitation the fees and allowed reimburseables of Program Manager's Construction Manager; (ii) <br />costs of plan check and permits for the Project (except to the extent waived); and (iii) the fees, costs <br />and allowed reimburseables of the Contractors, as set forth in the Construction Contracts let to the <br />Contractors. <br />Project = the construction/renovation of the Santa Ana Auto Mall per attached Exhibit A and <br />Exhibit B and by reference construction drawings prepared by Clark & Green Associates, City's <br />representative, 17-sheets dated 10/16/06 and subsequently revised on April 16, 2007, and any other <br />plans and documents to be prepared by Program Manager and/or Clark & Green Associates, which <br />are necessary to implement this project. <br />Project Documents = include this Agreement, the Scope of Work attached hereto as Exhibit A & <br />Exhibit B, and by reference, the construction drawings prepared by Clark & Green Associates, <br />City's representative, 17-sheets dated 10/16/06 and subsequently revised on April 16, 2007, any <br />other plans and documents to be or caused to be prepared by Project Manager necessary to <br />implement this Project, and any agreements between Program Manager, its Consultants, the <br />Construction Manager and the Contractors. <br />Project Site = those portions of Auto Mall Drive, Dan Gurney Drive, and Ritchey Street as detailed <br />in Exhibit A and said Project Documents in the City of Santa Ana. <br />2 <br />