Laserfiche WebLink
computations and projections), its Construction Manager and the Contractors related to negotiating, <br />pricing, or performing the change order modifications in order to evaluate the accuracy and <br />completeness of the cost or pricing data. The expense of said audit shall be at the sole cost of the <br />City. Program Manager shall assure that either Program Manager or its Construction Manager shall <br />retain the materials described in this paragraph, for examination, audit, or reproduction, until four <br />(4) years after completion of the Project. <br />3.8 Program Manager shall cause its Construction Manager to insert a clause essentially <br />containing the above audit provisions, in all of the subcontracts over Ten Thousand Dollars <br />($10,000.00). <br />3.9 Program Manager shall cause its Construction Manager to publicize bids for the <br />Project construction work in accordance with the City's "Standard Specifications" and the Santa <br />Ana Municipal Code, as it pertains to public works projects. Notwithstanding the foregoing, if and <br />only to the extent permitted by law, Program Manager shall be permitted to require the three lowest <br />bidders to re -bid after they have been selected as the three lowest bidders. Program Manager, as <br />agent and fiduciary to the City, shall have control of the bidding procedures inclusive of <br />determination of the lowest responsible bidder(s). <br />3.10 Program Manager will require its Construction Manager and all Contractors to use <br />their best efforts to prosecute the Project work in a manner to minimize public inconvenience and <br />possible hazard, to restore the streets and other work areas to their original condition and former <br />usefulness as soon as possible, and to protect public and private property adjacent to the Project. <br />ARTICLE 4 <br />4. THE CITY' S RESPONSIBILITIES <br />4.1 The City shall provide in a timely manner full information regarding its <br />requirements for the Project hereunder. <br />4.2 The Designated City Representative shall render, in a timely manner, all decisions <br />requested by Program Manager which may be necessary to perform the Project work. All decisions <br />rendered by the Designated City Representative shall be binding upon the City. Furthermore, any <br />City representative(s) present at the job site during construction shall be subject to reasonable rules <br />as may be imposed by Program Manager and/or its Construction Manager. <br />4.3 If the City discovers any fault, defect or nonconformance in the Project or with the <br />Drawings or Specifications, the City shall give prompt written notice to the Program Manager. The <br />Designated City Representative shall sign the final plans and specifications prior to issuance of <br />building permit. <br />4.4 The Program Manager will submit all plans for plan checks and will apply for and <br />obtain all building permits, grading permit(s) and construction permit(s) required by the City of <br />Santa Ana or other agencies, as applicable. The City shall pay or waive all fees in connection <br />5 <br />