My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRANT GENERAL CONTRACTORS
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
G-H (INACTIVE)
>
GRANT GENERAL CONTRACTORS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:10:42 PM
Creation date
8/23/2007 7:43:38 AM
Metadata
Fields
Template:
Contracts
Company Name
GRANT GENERAL CONTRACTORS
Contract #
A-2006-338
Agency
Community Development
Council Approval Date
9/16/2006
Insurance Exp Date
10/1/2007
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to oversee the Construction Manager's supervision of all Contractors as set forth in the Project <br />Documents as well as any exhibits attached hereto. <br />3.2 Program Manager shall assure that the agreements executed by its Construction <br />Manager and by all Contractors will, in the aggregate, satisfactorily provide all labor, materials, <br />tools, and construction equipment necessary for the execution and completion of the Project, and <br />that all Construction Contracts will incorporate within their contract sums the payment by the <br />Contractors for all sales, use, gross receipts and similar taxes related to the Project. Program <br />Manager shall be responsible for any of such costs due to its failure to cause same to be provided <br />by the Contractors. <br />3.3 Program Manager shall prepare, or cause its Construction Manager to prepare and <br />submit for the City's approval, an estimated progress schedule for the Project. The schedule shall <br />indicate the date for the commencement and completion of any stages of the design and <br />construction and provide for a completion date as set forth in Section 5.1 hereof. The Project <br />schedule is subject to revisions as required by the conditions of the Project, change orders, and <br />those conditions and events that are beyond the control of Program Manager, its Construction <br />Manager or the Contractors, including force majeure delays. <br />3.4 The Program Manager shall assure that all bid documents released for competitive <br />bidding to prospective Contractors, and all contracts awarded to Contractors, include a requirement <br />that such Contractors keep the Project Site free from accumulation of waste materials or rubbish <br />caused by such Contractors operations. If any subsequent law and/or ordinance are enacted which <br />affect the cost of the Project, Program Manager shall submit a revised Project Budget to reflect <br />such change and, once approved by the City, is authorized to direct its Construction Manager to <br />process change orders with affected Contractors consistent with such Project Budget revision. <br />3.5 The Program Manager shall make sure that all applicable provisions of federal, state <br />and local safety laws to safeguard against accidents or injury to persons on, about or adjacent to the <br />Project Site are complied with and enforced by its Construction Manager and the Contractors. The <br />foregoing shall not apply, however, with respect to the elimination or abatement of safety hazards <br />created or otherwise resulting from work at the Project carried on by persons or firms directly <br />employed or engaged by the City and not a part of the Project. The City shall cause such separate <br />contractors or tenants to abide by and fully adhere to all applicable provisions of federal, state and <br />safety laws and regulations and to comply with the reasonable request by the Construction Manager <br />for the elimination and abatement of any such safety hazard. <br />3.6 Program Manager shall keep, and also cause its Construction Manager to keep, such <br />full and detailed accounts as may be necessary for the proper construction and financial <br />management under this Agreement. The system will contain Program Manager's records, books, <br />correspondence, instructions, drawings, receipts, vouchers, memoranda and similar data relating to <br />this Agreement. <br />3.7 Program Manager shall obtain or keep, or cause its Construction Manager to obtain <br />or keep, and the City shall have the right to examine and audit, all books, estimates, records, <br />contracts, documents, bid documents, subcontracts, and other data of Program Manager (including <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.