Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />9 System Configuration for Test <br />9 Test Schedule and Time Requirements <br />9 Special Requirements for Testing <br />9 Expected Results <br />9 Range of Acceptable Limits for Results <br />9 Forms for Logging Results <br />9 Certification of Completion <br /> <br />Review TriTech Documentation - We would review TriTech documentation for <br />completeness and identification of test points. We would identify additional <br />documentation required for the City to repeat testing or verify measurements on <br />a <br />periodic basis. <br /> <br />Verify Testing Configuration - We would coordinate with TriTech to identify <br />necessary or proprietary test equipment for system testing and arrange for <br />equipment <br />availability. TriTech would be required to provide procedures to perform system <br />loading for statistically based tests. <br /> <br />Observe Testing Procedures - We would observe the testing of critical <br />components <br />of the system and observe a sampling of testing procedures. We would validate <br />participant understanding of test procedures and ensure test documentation is <br />completed accurately. <br /> <br />Review Completed Test Logs - On a scheduled basis, we would review testing <br />progress and completed field test reports. Areas of concern would be identified <br />and <br />discussed with the City's Project Manager. <br />Coordinate Corrections and Re- Test - When required corrections to system <br />components have been identified, we would work with TriTech to schedule <br />corrections and retesting. We would assist City representatives and TriTech <br />personnel to continue testing where appropriate. <br /> <br />Coordinate System Final Design and Installation - After completion and <br />approval <br />of the functional design document, the focus of the project team would then be <br />on <br />ensuring that all components of the system are coordinated and installed <br />according <br />to the final system design. We would coordinate system installation activities with <br />the City and TriTech including, data conversion, site preparation, and equipment <br />installation. We would document operational and control procedures, as needed, <br />and coordinate the resolution of design and installation issues. <br /> <br /> <br />