My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 1 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
RBF CONSULTING 1 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:32:42 PM
Creation date
9/6/2007 1:11:34 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2007-165
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
11/30/2008
Destruction Year
2017
Notes
Amended by A-2008-130, -001, -002, -003
Document Relationships
RBF CONSULTING 1A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1B - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ucatiOn �Tt <br />1. INTRODUCTION <br />FIRM OVERVIEW <br />City of Santa Ana <br />Statement of Qualifications for <br />On -Call Environmental Review Services <br />RBF Consulting is a multi -disciplinary planning, engineering and surveying firm with a total <br />staff of over 1,000 professionals, with offices in Contra Costa, Marin, Santa Clara, <br />Sacramento, Orange, Riverside, San Bernardino, Ventura, Los Angeles, and San Diego <br />counties. With over 60 years of public and private sector experience, RBF is respected and <br />recognized in the profession of consulting planning, environmental, and engineering <br />services throughout the state of California. RBF has in-house expertise in disciplines <br />including Environmental Analysis, Planning, GIS Services, Surveying, Aerial <br />Photogrammetry, Mapping, Real Estate Assessments, Transportation/Traffic Engineering, <br />Civil Engineering (including Grading, Public Works, Water/Wastewater, Hydrology), <br />Mechanical/ Electrical/Energy Services, Computer Aided Design and Drafting (CADD) and <br />Media Services. Over 75 professionals are dedicated to Planning, Environmental Services <br />and Landscape Architecture. <br />RBF possesses the full range of disciplines necessary to provide turn -key planning, design <br />and implementation of a wide range of projects. We combine our expertise in development <br />projects and urban planning, transportation and air quality management, to develop and <br />assess project designs that minimize impacts to the natural environment and community. <br />The following is a comprehensive list of RBF departments and services: <br />DEPARTMENTS AREAS OF EXPERTISE <br />Land Planning and Urban Conceptual Design; Master Planning; Site Planning; Hillside <br />Design: Grading; Landscape Architecture; Redevelopment and Infill <br />Land Use Planning; Illustrative Plans; Pedestrian and <br />Vehicular Trail Studies; Visual Analysis; Design Guidelines <br />and Development Standards. <br />Policy Planning: Specific Plans, General Plans; Community Participation <br />Programs; Project Management, and Coordination; <br />Feasibility/Special Studies; Fee Programs; Entitlement to <br />Use (including zone changes, General Plan Amendments <br />and annexation studies); Redevelopment Studies; <br />Consultant Coordination; Governmental Agencies/Public <br />Liaison; and Development Support Services through <br />Construction. <br />Environmental Services: Environmental Impact Reports/Statements; Expanded Initial <br />Studies/Negative Declarations; Mitigation Monitoring <br />Programs; Public Participation Programs; Natural Resource <br />Management; Resource Mitigation Permits; EIR and EIS <br />Review; Noticing; Statements of Overriding Considerations; <br />Findings; and Special Studies, such as Phase I Site <br />Assessment for hazardous materials, as well as noise and <br />air quality monitoring and modeling. <br />JN 00-000300.10P 0 1 0 May 21, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.