My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 1 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
RBF CONSULTING 1 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:32:42 PM
Creation date
9/6/2007 1:11:34 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2007-165
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
11/30/2008
Destruction Year
2017
Notes
Amended by A-2008-130, -001, -002, -003
Document Relationships
RBF CONSULTING 1A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1B - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RJ <br />L <br />City of Santa Ana <br />Proposal for 601 North Parkcenter Drive <br />Initial Study and Mitigated Negative Declaration <br />Population: The analysis will address the potential for growth inducement. <br />Public Services: The affect on existing services including fire, law <br />enforcement, solid waste management/disposal, educational, and <br />recreational services will be studied. <br />Traffic and Parking: The results of the traffic impact study, referenced in <br />Task 3.0 will be incorporated. <br />Utilities: The affect on existing infrastructure will be evaluated, including <br />water, electricity, gas, and wastewater. The results of the sewer study, <br />referenced in Task 3.0 will be incorporated. <br />Mandatory Findings of Significance: Focus on cumulative affects and <br />considerations. <br />4.4 INITIAL STUDY DETERMINATION <br />The determination page will conclude the appropriate action based upon the Initial <br />Study evaluation. <br />4.5 GRAPHIC EXHIBITS <br />The environmental document will include a maximum of ten (10) exhibits to enhance <br />-the written text and clarify the Project and potential environmental impacts. <br />4.6 DRAFT INITIAL STUDY <br />RBF will submit three (3) copies of the Draft Initial Study for review and comment by <br />the City. Should additional copies be required, additional copies will be provided by <br />RBF at an additional fee. RBF will also submit one (1) "check copy" of the final draft <br />document, which will incorporate one complete set of comments received from the <br />City. Changes to the draft document will be highlighted to assist the review. <br />5.0 MITIGATED NEGATIVE DECLARATION <br />PREPARATION <br />With a conclusion in the Initial Study that no significant environmental effects will occur as a <br />result of implementation of the Project, a Mitigated Negative Declaration will be prepared. <br />Following this determination, RBF will prepare the Notice of Intent (NO]) to Adopt and the <br />Mitigated Negative Declaration for City review. The NOI and Mitigated Negative Declaration <br />will be attached to the Initial Study to fully explain the proposed Project and its affects. Fifty <br />(50) copies, twenty-five (25) CDs, one (1) camera-ready original and an electronic file of the <br />Mitigated Negative Declaration will be provided to the City. RBF will provide the submittal to <br />the State Clearinghouse and additional distribution as directed by the City. <br />JN 10-105908 <br />• 12 • <br />August 8, 2007 <br />µ1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.