My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN & ASSOCIATES, INC. 3 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
KIMLEY-HORN & ASSOCIATES, INC. 3 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:26:15 PM
Creation date
9/6/2007 3:40:20 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN & ASSOCIATES, INC.
Contract #
A-2007-160
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
9/1/2008
Destruction Year
2017
Notes
Amended by A-2008-120, -001, -002, -003
Document Relationships
KIMLEY-HORN & ASSOCIATES, INC. 3A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
KIMLEY-HORN & ASSOCIATES, INC. 3B - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
KIMLEY-HORN & ASSOCIATES, INC. 3C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
KIMLEY-HORN & ASSOCIATES, INC. 3D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley-Horn Mr. Shahir Gobran, Page 2, March 21, 2007 <br />and Associates, Inc. <br />• Prepare a summary of the results of the queuing intrusion study. The study will <br />summarize analysis methodology, findings, and recommendations. <br />• If the queuing intrusion study identifies incidents of intrusion, then the Owner / <br />Operator will be required to develop and implement a queuing management plan, <br />and a follow-up study will be required within two to three months following the <br />first study. <br />• If no incidents are documented, then an annual follow-up study will be required <br />for each of the five years following the first study. This Scope of Services is for <br />the first two years of studies only. <br />Additional Services <br />Any services not specifically provided for in the above scope will be considered <br />additional services and can be performed at our then current hourly rates. <br />Attendance at meetings or at public meetings and public hearings will be extra <br />services, and will be billed on a time -and -materials basis in accordance with the <br />standard hourly billing rate schedule in effect at the time the meetings are requested. <br />Additional services we can provide include, but are not limited to, the following: <br />• Parking data collection or a parking study <br />• Additional data collection <br />• Traffic signal design <br />• Signing and Striping Plans <br />• Traffic Control Plans <br />• Signal Warrant <br />Information Provided By Client <br />The Client shall provide all information requested by KHA during the project, <br />including but not limited to the following: <br />• A copy of the project site plan for the proposed project, including building <br />and site layout, and site driveways. <br />We shall be entitled to rely on the completeness and accuracy of all information <br />provided by the Client. <br />Schedule <br />We are prepared to begin services upon receipt of authorization to proceed. We will <br />order queuing intrusion data collection to take place during the first available valid <br />count period following authorization. We will complete and submit a draft of the <br />study one week following receipt of all necessary data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.