Laserfiche WebLink
T� <br />City of Santa Ana <br />Preliminary and Final Design for <br />Ramp Widening of MacArthur Blvd at SR -55 Interchange <br />PBS &J Direct Labor <br />Labor Category <br />Person Hour <br />Rate /Hour <br />Total Direct Labor <br />Project Principal /QC <br />50 <br />$216.00 <br />$10,800.00 <br />Project Manager ( +120) <br />366 <br />$184.32 <br />$67,461.12 <br />Project Engineer <br />314 <br />$157.85 <br />$49,565.78 <br />Civil Engineer <br />417 <br />$86.40 <br />$36,028.80 <br />Environmental Manager <br />16 <br />$165.60 <br />$2,649.60 <br />Environmental Planner <br />72 <br />$100.80 <br />$7,257.60 <br />Structure Engineer <br />0 <br />$155.52 <br />$0.00 <br />Cadd <br />184 <br />$128.16 <br />$23,581.44 <br />Admin <br />12 <br />$57.60 <br />$691.20 <br />Total Hours (PBS &J) <br />1431 <br />$198,036 ; <br />ODC (PBS &J) <br />Unit <br />Unit Rate <br />Mileage <br />500 <br />$0.49 <br />$242.50 <br />Reports / Printing <br />LS <br />1 <br />$2,500.00 <br />Phone <br />LS <br />1 <br />$500.00 <br />Postage /Fed ex <br />LS <br />1 <br />$500.00 <br />TQTAL ODC $3,742.50 <br />Sub - Consultants <br />Leighton - Geotechnical $30,000 <br />Urban Cross Road- Traff ic $30,000 <br />Towill- Survey, utility $20,000 <br />Additional Fee if ND is required 228 $300,958.84 <br />EXHOIT 13 1 <br />